Transcript 802.22
doc.: IEEE 802.22-13/0099r00 July Plenary Opening Report IEEE P802.22 Wireless RANs Authors: Name Company Apurva N. Mody BAE Systems Date: 2013-07-12 Address Phone email P. O. Box 868, MER 15-2350, Nashua, NH 03061 1-404-8190314 apurva.mody@baesyst ems.com apurva_mody@yahoo. com Notice: This document has been prepared to assist IEEE 802.22. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE 802.22. Patent Policy and Procedures: The contributor is familiar with the IEEE 802 Patent Policy and Procedures http://standards.ieee.org/guides/bylaws/sb-bylaws.pdf including the statement "IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard." Early disclosure to the Working Group of patent information that might be relevant to the standard is essential to reduce the possibility for delays in the development process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chair Apurva N. Mody < [email protected] > as early as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a draft standard being developed within the IEEE 802.22 Working Group. If you have questions, contact the IEEE Patent Committee Administrator at [email protected]. > Submission Slide 1 Apurva N. Mody, BAE Systems doc.: IEEE 802.22-13/0099r00 Outline • • • • • • • • • IEEE 802.22 WG Agenda IEEE P802.22 – Progress Report IEEE P802.22.1 – Progress Report IEEE P802.22.2 – Progress Report IEEE P802.22a – Progress Report IEEE 802.22b – Progress Report Letters of Assurance Past and Future Meetings Likely WG Motions at the March EC Meeting Submission Slide 2 Apurva N. Mody, BAE Systems doc.: IEEE 802.22-13/0099r00 IEEE P802.22 WG Agenda • Opening Plenary • Motions at the EC – No motions proposed this time – Notification to the EC on Motion to forward P802.22a to Sponsor Ballot • IEEE P802.22 – Project Completed. Standard published on July 1st, 2011. • IEEE P802.22.1 – Project Completed. Standard published on November 1st 2010 • IEEE 802.22.2 – Project completed. Standard published on Sept. 28th 201 • Opening Plenary • Tutorial – None • Joint ITU / IEEE Meeting initiated by the IEEE 802.22 Working Group on Spectrum Sharing and White Space Standardization within IEEE 802 • Mid-week plenary – No Mid-week Plenary • Closing Plenary (Thursday, PM1) • EC Meeting IEEE 802.22 Meeting Agenda for the July 2012 • EC Workshop Plenary can be found here Submission Slide 3 Apurva N. Mody, BAE Systems doc.: IEEE 802.22-13/0099r00 IEEE P802.22.1 Progress Report • IEEE802.22.1-2010 Standard was published in 2010 • Revision Project on IEEE 802.22-2010 initiated that incorporates Advanced Beaconing for protection of systems in HF, VHF, UHF, and S-Band (2-4 GHz). Call for contributions made Submission Slide 4 Apurva N. Mody, BAE Systems doc.: IEEE 802.22-13/0099r00 IEEE P802.22 Progress Report • IEEE802.22-2011 Standard was published on July 1st 2011. • We would like to thank the 802.22 members and contributors, Members of the IEEE 802 Executive Committee, Members of the IEEE SA RevCom, Members of the IEEE SA Board and the IEEE SA Staff. Submission Slide 5 Apurva N. Mody, BAE Systems doc.: IEEE 802.22-13/0099r00 IEEE P802.22.2 Progress Report • IEEE802.22.2-2012 Standard was published on Sept. 28th 2012. • We would like to thank the 802.22 members and contributors, Members of the IEEE 802 Executive Committee, Members of the IEEE SA RevCom, Members of the IEEE SA Board and the IEEE SA Staff. Submission Slide 6 Apurva N. Mody, BAE Systems doc.: IEEE 802.22-13/0099r00 • • • • • IEEE P802.22a MIBs and Managememt Plane Procedures First P802.22a WG Re-circulation letter ballot is under-way. Continuing work on MIB development. Current Response and Approval Ratio is at shown 2nd Working Group Re-circulation Ballot has been completed Motion to be made to the EC to forward the P802.22a to the Sponsor Ballot Submission Total # # Respondents 29 26 Return Ratio Approve Ratio 89% 100% Slide 7 Apurva N. Mody, BAE Systems doc.: IEEE 802.22-13/0099r00 IEEE P802.22b Enhancement for Broadband Services and Monitoring Applications Task Group formed Process document Functional Requirements Call for Proposals issued Selection Criteria Technical/Informative Contributions Proposal presentations Baseline proposal selected Draft for 1st letter ballot 1st letter ballot completed 2012 1 3 5 7 9 x 11 1 11 2014 1 3 5 7 9 11 x x x x x x x x x x x x x x x x Comment Resolution x 2nd letter ballot completed Comment Resolution and recirculation Sponsor ballot Comment Resolution and recirculation RevCom/NesCom Approval Submission 2013 3 5 7 9 x x x x x x Chang-woo Pyo (NICT) x March 2012 doc.: IEEE 802.22-13/0099r00 IEEE P802.22 Letter of Assurance • The LoAs can be found on the website at www.ieee802.org/22 as well as on the IEEE SA website Submission Slide 9 Apurva N. Mody, BAE Systems doc.: IEEE 802.22-13/0099r00 Future Sessions IEEE 802.22 Future Sessions are planned as follows Submission Session Dates Location Plenary July 14-19, 2013 ITU Headquarters, Geneva, Switzerland Interim Sept 15-20, 2013 Nanjing, China Plenary Nov. 10-15, 2013 Dallas, Tx Interim Jan 19-24, 2014 Hyatt Century Plaza, Los Angeles Plenary Mar 16-21, 2014 China World Hotel, Beijing, China Interim May 11-16, 2013 Hilton, Waikoloa Village Plenary July 13-16, 2014 Manchester Grand Hyatt, San Diego Interim Sep 14-19, 2014 Venue TBD Slide 10 Apurva N. Mody, BAE Systems doc.: IEEE 802.22-13/0099r00 802.22 Sponsored Tutorial There are no 802.22 Tutorials for this session Submission Slide 11 Apurva N. Mody, BAE Systems doc.: IEEE 802.22-13/0099r00 IEEE 802.22 Initiated Joint Meeting on Spectrum Sharing and White Space Standardization in IEEE 802 Spectrum Sharing and White Space Standardization within IEEE 802 to Bridge the Digital Divide Venue ITU Headquarters, Geneva, Switzerland Tuesday, July 16th, CICG, Room 4 Time: 10.30 am – 12.30 pm This meeting is open to all the ITU badge holders Submission Slide 12 Apurva N. Mody, BAE Systems doc.: IEEE 802.22-13/0099r00 IEEE 802.22 Initiated Joint Meeting on Spectrum Sharing and White Space Standardization in IEEE 802 Agenda - Overview of Spectrum Sharing and Whitespace Activities at ITU – Philippe Aubineau (5 to 10 minutes) Will confirm by weekend - White Spaces: “Managing Spaces or Better Managing Inefficiencies - Christian Gomez - Spectrum Regulation and Policy Officer OPS, Radiocommunication Bureau (15 minutes) - Overview of the IEEE 802 Standards – Nikolich (10 minutes) - IEEE 802.11AF and IEEE 802.11 5 GHz Spectrum Sharing Standardization Activities – Kraemer (20 minutes) - IEEE 802.15.4m Standard for TV Band White Spaces- Speaker TBD (15 minutes) - IEEE 802.19.1 Co-existence Standardization –Shellhammer (15 minutes) - IEEE 802.22 Cognitive Radio based Wireless Regional Area Networks – Mody (15 minutes) - IETF-PAWS Activities and IEEE 802 Collaboration- Bajko/ Das or Mody - (15 minutes) - Q&A and Discussions - 10 minutes Submission Slide 13 Apurva N. Mody, BAE Systems doc.: IEEE 802.22-13/0099r00 IEEE 802.22 Initiated Joint Meeting on Spectrum Sharing and White Space Standardization in IEEE 802 Submission Slide 14 Apurva N. Mody, BAE Systems doc.: IEEE 802.22-13/0099r00 Likely P802.22 WG Motions to the EC(2) – Request to Initiate IEEE 802.22 Revision PAR Submission Slide 15 Apurva N. Mody, BAE Systems doc.: IEEE 802.22-13/0099r00 Likely Motion Motion for Initiate IEEE 802.22 Revision PAR Submission Apurva N. Mody, Slide 16 BAE Systems doc.: IEEE 802.22-13/0099r00 References • IEEE 802.22 WG Agenda, March Plenary, Orlando, FL https://mentor.ieee.org/802.22/dcn/13/22-13-0096-00-0000-july-plenary-working-groupagenda.xls • Meeting minutes of the 802.22 WG May 2013 Interim: https://mentor.ieee.org/802.22/dcn/13/22-13-0098-00-0000-may-interim-working-groupmeeting-minutes.doc Submission Slide 17 Apurva N. Mody, BAE Systems