Transcript 802.22
doc.: IEEE 802.22-12/0074r00 July Plenary Closing Report IEEE P802.22 Wireless RANs Authors: Name Company Apurva N. Mody BAE Systems Date: 2012-07-20 Address Phone email P. O. Box 868, MER 15-2350, Nashua, NH 03061 1-404-8190314 apurva.mody@baesyst ems.com apurva_mody@yahoo. com Notice: This document has been prepared to assist IEEE 802.22. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE 802.22. Patent Policy and Procedures: The contributor is familiar with the IEEE 802 Patent Policy and Procedures http://standards.ieee.org/guides/bylaws/sb-bylaws.pdf including the statement "IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard." Early disclosure to the Working Group of patent information that might be relevant to the standard is essential to reduce the possibility for delays in the development process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chair Apurva N. Mody < [email protected] > as early as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a draft standard being developed within the IEEE 802.22 Working Group. If you have questions, contact the IEEE Patent Committee Administrator at [email protected]. > Submission Slide 1 Apurva N. Mody, BAE Systems doc.: IEEE 802.22-12/0074r00 Outline • • • • • • • • • • IEEE 802.22 WG Agenda IEEE P802.22 – Progress Report IEEE P802.22.1 – Progress Report IEEE P802.22.2 – Progress Report IEEE P802.22a – Progress Report IEEE 802.22b – Progress Report New Study Group on Amendment to IEEE P802.22.1 Letters of Assurance Past and Future Meetings Likely WG Motions at the March EC Meeting Submission Slide 2 Apurva N. Mody, BAE Systems doc.: IEEE 802.22-12/0074r00 IEEE P802.22 WG Agenda • Opening Plenary • Motions at the EC - Request the chair to make the following motions to the EC – Request that EC Approve the formation of a Study Group for an amendment to the IEEE 802.22.1 • IEEE P802.22 – Project Completed. Standard published on July 1st, 2011. • IEEE P802.22.1 – Project Completed. Standard published on November 1st 2010 • IEEE 802.22.2 – Submitted to RevCom • Opening Plenary • Tutorial – None • Mid-week plenary – No Mid-week Plenary • Closing Plenary (Thursday, PM1, PM2) • EC Meeting Submission Slide 3 Apurva N. Mody, BAE Systems doc.: IEEE 802.22-12/0074r00 IEEE P802.22.1 Progress Report • IEEE802.22.1-2010 Standard was published in 2010 • We would like to sincerely thank the 802.22 members and contributors, Members of the IEEE 802 Executive Committee, Members of the IEEE SA RevCom, Members of the IEEE SA Board and the IEEE SA Staff. Submission Slide 4 Apurva N. Mody, BAE Systems doc.: IEEE 802.22-12/0074r00 IEEE P802.22 Progress Report • IEEE802.22-2011 Standard was published on July 1st 2011. • We would like to sincerely thank the 802.22 members and contributors, Members of the IEEE 802 Executive Committee, Members of the IEEE SA RevCom, Members of the IEEE SA Board and the IEEE SA Staff. Submission Slide 5 Apurva N. Mody, BAE Systems doc.: IEEE 802.22-12/0074r00 IEEE P802.22.2 Progress Report • P802.22.2 Sponsor Ballot process has been completed • 802.22 received an approval from the EC to forward 802.22.2 to the RevCom. • The approval and response ratios can be found below: Submission Slide 6 Apurva N. Mody, BAE Systems doc.: IEEE 802.22-12/0074r00 Motion Motion for a Approval to forward the IEEE P802.22.2 to the IEEE SA RevCom Submission Apurva N. Mody, Slide BAE 7 Systems doc.: IEEE 802.22-12/0074r00 Motion for Approval to forward the IEEE P802.22 to the IEEE SA RevCom Rules Motions requesting conditional approval to forward when the prior ballot has closed shall be accompanied by: • Date the ballot closed • Vote tally including Approve, Disapprove and Abstain votes • Comments that support the remaining disapprove votes and Working Group responses. • Schedule for confirmation ballot and resolution meeting. Submission doc.: IEEE 802.22-12/0074r00 Motion for a Conditional Approval to forward the IEEE P802.22.2 to the IEEE SA RevCom Number of People in the Sponsor Ballot Pool = 102 IEEE Sponsor / Re-circ Ballot Respo nse Ratio Approval Ratio Negative Votes Number of Negative Comments Received Comment Resolutio n Status Draft Status Sponsor Ballot #1 Open – Feb 20 2012, Closed – Mar 20, 2012 81% 97% 2 Negative Votes with Comments 5 Comments addressed & resolved - 2212-0029 Rev4 P802.22.2/ D 2.0 prepared 100% 0 Negative Votes Received 0 Comments addressed & resolved – 2212-0029 Rev4 P802.22/D 3.0 prepared 100% 0 Negative Votes Received 0 No more comments to resolve P802.22/D 3.0 to be sent to RevCom Sponsor Ballot Re-circ #1 Open – Apr. 22nd, 2012, Closed – May 7th, 2012 Sponsor Ballot Re-circ #1 Open – May. 23rd, 2012, Closed – June 2nd, 2012 Submission (4% abstain) 85% (8% abstain) 87% (6% abstain) Apurva N. Mody, Slide BAE 9 Systems doc.: IEEE 802.22-12/0074r00 P802.22 WG Motions WG Motion #7 Document – 22-11-0048 Rev0 Move to authorize the P802.22 WG Chair and the Ballot Resolution Committee (Gerald Chouinard, Apurva Mody, Tom Gurley) to continue the comment resolution of the P802.22.2 comments for Draft v1.0. The Chair to issue Draft v2.0 of the P802.22.2 Recommended Practice and launch a 30 day Sponsor Ballot or 15 day Sponsor re-circulation ballot as he sees fit no later than April 20th. Subsequently to resolving the comments for P802.22.2 authorize the P802.22 WG Chair to issue further drafts and launch other rounds of re-circulation ballot, if required to meet the conditions to send the draft to RevCom. Move: Apurva Mody Second: Jerry Kalke For: 8 Against: 0 Abstain: 0 Submission WG Motion #2 Document – 22-110059 Rev0 The IEEE 802.22 Working Group authorizes the WG Chair to seek (Conditional) Approval from the IEEE 802 Executive Committee to forward P802.22.2/D3.0 to the IEEE SA RevCom. Move: Ivan Reede Second: Dr. Chang-woo Pyo For: 8 Against: 0 Abstain: 0 Motion passes unanimously Apurva N. Mody, Slide 10 BAE Systems doc.: IEEE 802.22-12/0074r00 Motion for Un-conditional Approval to forward the IEEE P802.22.2 Draft Standard to the IEEE SA RevCom Move that EC grants un-conditional approval as per the IEEE 802 Operations Manual to forward IEEE P802.22.2 D3 to the IEEE Standards Association Review Committee. (13 EC Members present during the June 5th EC Telecon) Move: Apurva N. Mody, Second: James Gilb Any Objection for unconditional approval? No Objections MOTION PASSES http://www.ieee802.org/minutes/Conferencecalls/2012_06_05_Call_Minutes_R0.pdf Submission Apurva N. Mody, Slide 11 BAE Systems July 2012 doc.: IEEE 802.22-12/0074r00 802.22 WG Motion to form Study Group for Amendment to the IEEE 802.22.1 Standard for Advanced Beaconing Submission Apurva N. Mody, Slide 12 BAE Systems July 2012 doc.: IEEE 802.22-12/0074r00 P802.22 WG Motion Members of the IEEE 802.22 WG authorize the Chair of IEEE 802.22 to make a motion to the IEEE 802 Executive Committee during the July EC Closing Plenary to seek an approval to form an Advanced Beaconing study group under the 802.22 Working Group for an amendment to the IEEE Std. 802.22.12010 Move: Jerry Kalke Second: Chunyi Song For: 9 Against: 0 Abstain: 0 Submission Apurva N. Mody, Slide 13 BAE Systems July 2012 doc.: IEEE 802.22-12/0074r00 P802.22 EC Motion Move that the EC allows formation of an Advanced Beaconing Study Group under the 802.22 Working Group for an Amendment to the IEEE Std. 802.22.12010 Standard. Move: Apurva Mody Second: Subir Das For: 13 Against: 0 Abstain: 1 Motion Passes Submission Apurva N. Mody, Slide 14 BAE Systems July 2012 doc.: IEEE 802.22-12/0074r00 References • 802.22 July Plenary WG Motions: https://mentor.ieee.org/802.22/dcn/12/22-120072-00-0000-july-plenary-motions.doc • White House PCAST report “Realizing the Full Potential of Government –held Spectrum to Spur Economic Growth,” http://www.whitehouse.gov/sites/default/files/spectrum.pdf Submission Apurva N. Mody, Slide 15 BAE Systems doc.: IEEE 802.22-12/0074r00 IEEE P802.22a MIBs and Managememt Plane Procedures • First P802.22a WG letter ballot is under-way. • Received 42 Comments • Implemented resolution of comments discussed during last faceto-face • Continuing work on MIB development. Submission Slide 16 Apurva N. Mody, BAE Systems doc.: IEEE 802.22-12/0074r00 IEEE P802.22b Enhancement for Broadband Services and Monitoring Applications Task Group formed Process document Functional Requirements Call for Proposals issued Selection Criteria Technical/Informative Contributions Proposal presentations Baseline proposal selected Draft for 1st letter ballot 1st letter ballot completed 2012 1 3 5 7 9 x 11 1 11 2014 1 3 5 7 9 11 x x x x x x x x x x x x x x x x Comment Resolution x 2nd letter ballot completed Comment Resolution and recirculation Sponsor ballot Comment Resolution and recirculation RevCom/NesCom Approval Submission 2013 3 5 7 9 x x x x x x Chang-woo Pyo (NICT) x March 2012 doc.: IEEE 802.22-12/0074r00 IEEE P802.22 Letter of Assurance • The LoAs can be found on the website at www.ieee802.org/22 as well as on the IEEE SA website Submission Slide 18 Apurva N. Mody, BAE Systems doc.: IEEE 802.22-12/0074r00 Future Sessions IEEE 802.22 Future Sessions are planned as follows Submission Session Dates Location Interim Sep 16-21, 2012 Indian Wells, CA Plenary Nov 11-16, 2012 San Antonio, Tx Interim Jan 13 -18, 2013 Vancouver, BC Plenary March 17 – 22, 2013 Orlando, FL Interim May 12-17, 2013 Waikoloa, HI Slide 19 Apurva N. Mody, BAE Systems doc.: IEEE 802.22-12/0074r00 Likely P802.22 WG Motions to the EC(2) Request that EC Approve the formation of a Study Group for an amendment to the IEEE 802.22.1 Submission Slide 20 Apurva N. Mody, BAE Systems doc.: IEEE 802.22-12/0074r00 802.22 Sponsored Tutorial There are no 802.22 Tutorials for this session Submission Slide 21 Apurva N. Mody, BAE Systems doc.: IEEE 802.22-12/0074r00 References • IEEE 802.22 WG Agenda, July Plenary, San Diego, CA. https://mentor.ieee.org/802.22/dcn/12/22-12-0062-00-0000-july-plenary-working-groupagenda.xls • Meeting minutes, June 5th EC Telecon: http://www.ieee802.org/minutes/Conferencecalls/2012_06_05_Call_Minutes_R0.pdf • July Plenary EC Closing Motions - https://mentor.ieee.org/802.22/dcn/12/22-12-007302-0000-802-22-july-plenary-ec-motions.ppt • White House PCAST report “Realizing the Full Potential of Government –held Spectrum to Spur Economic Growth,” - http://www.whitehouse.gov/sites/default/files/spectrum.pdf • July Plenary WG Motions - https://mentor.ieee.org/802.22/dcn/12/22-12-0073-01-0000802-22-july-plenary-ec-motions.ppt Submission Slide 22 Apurva N. Mody, BAE Systems