Transcript 06/423r0
September 2006 doc.: IEEE 15-06-0423-00-003c Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Closing Report September 2006 Melbourne Australia] Date Submitted: [21 September 2006] Source: [Reed Fisher] Company [Oki Electric Industry Co., Ltd.] Address [2514 E. Maddox Rd., Buford, GA 30519 USA.] Voice:[1-770-271-0529] E-Mail:[[email protected]] Re : [] Abstract:[Description of TG3c September 2006 meeting proceedings ] Purpose:[Report to 802.15 Closing Interim Meeting, 22 September 2006] Notice :This document has been prepared to assist the IEEE P802.15. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release:The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P802.15. TG3c Slide 1 R. Fisher, Oki Electric Industry co. Ltd September 2006 doc.: IEEE 15-06-0423-00-003c TG3c 9th Meeting, Melbourne Closing Report 22 September, 2006 TG3c Slide 2 R. Fisher, Oki Electric Industry co. Ltd September 2006 doc.: IEEE 15-06-0423-00-003c 1. 08:00 September 19. Call to order. 2. TG3c Leadership: Chair: R. Fisher. vice Chair: A. Mathew Secretaries : H. Ikeda, S-K Yong 3. Attendance: Approx. 54-58 attendees in each slot 4. Ten 2-hour time slots were allocated Sep. 19 (Tue) Sep. 20 (Wed) Sep. 21 (Thu) AM1 X X X AM2 X X PM1 X X PM2 X X X 5. 18:00 September 21 Meeting adjourned TG3c Slide 3 R. Fisher, Oki Electric Industry co. Ltd September 2006 doc.: IEEE 15-06-0423-00-003c Meeting Accomplishments Reviewed and updated channel modeling work. Five LOS models and one NLOS model are defined. Five Usage Models were reviewed and approved. Heard four contributions on modulation, PHY computer simulation, and 60GHz Power Amplifier. Discussed and updated TG3c project timeline. TG3c Slide 4 R. Fisher, Oki Electric Industry co. Ltd September 2006 doc.: IEEE 15-06-0423-00-003c Contribution List # Title Doc. # 1 tg3c-opening-introduction 06/373r1 - R. Fisher 2 15-3c-sep06-meeting-agenda-and-objectives 06/372r3 - R. Fisher 3 CHANNEL MODEL STATUS REPORT 06/037r4 - A. Mathew 4 merging-two-path-and-v-models-los-desktop-channel-environments.pdf 06/297r3 - H. sawada 5 LOS office channel model based on TSV model 06/377r2 - H. sawada 6 LOS residential channel model based on TSV model 06/393r0 - H. sawada 7 MATLAB code and its flowchart for TSV model 06/389r0 - H. Harada 8 channel-model-large-scale-and-small-scale-parameterization 06/400r1 - S. K. Yong 9 An MSK system for Mobile Multi-Gb/s at 60GHz, concept, application and implementation 06/392r2 - B. Gaucher 10 phy-layer-modulation-802-15-3c-system-level-issues 06/387r2 - A. Bourdoux 11 A scheme to evaluate PHY performance by computer simulation 06/386r1 - H. Harada 12 Behavior model of 60GHz power amplifier for system/PHY simulation 06/396r1 - C.S. Choi 13 Usage Model Document Status Report 06/146r4 - A. Sadri 14 Re-summarization of merged UMD parameters 06/379r2 - C.S. Choi 15 summary-usage-model 06/369r6 - A. Sadri 16 usage-model-document-comments-final-draft-bosco 06/399r1 - J. Barr 17 summary-available-channel-models 06/411r0 - A. Seyedi 18 tg3c-technical-requirement-sub-group-report.ppt 05/430r10 - A. Seyedi 19 tg3c-project-plan. 05/311r9 - A. Seyedi TG3c Slide 5 Presented by R. Fisher, Oki Electric Industry co. Ltd September 2006 doc.: IEEE 15-06-0423-00-003c 05/311r9 Plan to Get to Baseline Document • 09/06 (Melbourne, Aus.) - Continued channel model discussions. Continued development of UMD. Future plan: • 11/06 (Dallas TX) – Finalize channel model. Finalize channel model document. Finalize UMD document. Finalize Technical Requirements. Issue CFP. Continue MAC discussions and make recommendation for MAC development. • 01/07 (London, UK) – Presentation of preliminary proposals. • 03/07 (Orlando, FL) – Final proposals due 1 week prior to meeting. Presentation of all proposals. • 05/07 (Montreal, CA) – Present updated/merged proposals. Down selection begins. If down-selection finishes, begin drafting Standard. TG3c Slide 6 R. Fisher, Oki Electric Industry co. Ltd September 2006 doc.: IEEE 15-06-0423-00-003c 05/311r9 Ballot plan • • • • • TG3c 07/07 – First letter ballot 09/07 – Re-circulation 11/07 – 802 Sponsor ballot 01/08 – 802 Sponsor re-circulation 03/08 – Standard finished. Slide 7 R. Fisher, Oki Electric Industry co. Ltd September 2006 doc.: IEEE 15-06-0423-00-003c TG3c Timeline TG3c Timeline (Based on 05/311r9 Project timeline) 5 x 6 7 Task Group Formed Call for application created July 2004 x Call for intent(CFI) to propose x System requirements document Selection criteria document x Channel Models creation Channel Models Release Down-selection procedure document Usage Model Document(UMD) MAC related System Attributes Recommendation for MAC modification Call for proposal issued Present preliminary proposals Present all final proposals Present updated/merged proposals Down Selection started Down Selection finished Draft Baseline completed 1st letter ballot completed Resolution of comments completed Re-circulation completed Resolve re-circulation comments TG3c 2005 8 9 10 11 12 1 x x 2 5 2006 6 7 x x x x x x x x x x 3 4 8 9 10 11 12 1 x x x x x x x x x x x x x 2007 2 3 4 x x x x x x x x x x x x x x x x Slide 8 R. Fisher, Oki Electric Industry co. Ltd