Transcript 802.11
July 2011 doc.: IEEE 802.11-11/1075r1 802.11 July 2011 Closing Plenary Reports Date: 2011-07-22 Authors: Name Company Adrian Stephens Intel Corporation Report Address Phone email +44 792 008 4900 (mobile) [email protected] Slide 1 Adrian Stephens, Intel Corporation July 2011 doc.: IEEE 802.11-11/1075r1 Abstract • This document is a digest of the closing reports of all 802.11 sub-groups for presentation at the July 2011 closing plenary meeting. Report Slide 2 Adrian Stephens, Intel Corporation July 2011 doc.: IEEE 802.11-11/1075r1 802.11 WG Editor’s Meeting (July ‘11) Date: 2011-06-01 Authors: Name Affiliation Address Phone email Peter Ecclesine Cisco Systems 170 W. Tasman Dr., MS SJ-14-4, San Jose, CA 951341706 +1-408-527-0815 [email protected] Report Slide 3 Adrian Stephens, Intel Corporation from slide 1/7 of 11-11/0849r2 by Peter Ecclesine (Cisco Systems) July 2011 July 2011 doc.: IEEE 802.11-11/1075r1 Volunteer Editor Contacts • • • • • • • • • • Report TGs – Kazuyuki Sakoda – [email protected] TGmb – Adrian Stephens – [email protected] TGaa – Alex Ashley – [email protected] TGac – Robert Stacey – [email protected] TGad – Carlos Cordeiro – [email protected] TGae – Henry Ptasinski – [email protected] TGaf – Peter Ecclesine – [email protected] TGah – Minyoung Park – [email protected] TGai – Tom Siep – [email protected] Editors Emeritus: – TGk – Joe Kwak– [email protected] – TGp – Wayne Fisher – [email protected] – TGr – Bill Marshall – [email protected] – TGu – Necati Canpolat – [email protected] – TGv – Emily Qi – [email protected] – TGw – Nancy Cam-Winget – [email protected] – TGz – Menzo Wentink – [email protected] Slide 4 Adrian Stephens, Intel Corporation from slide 2/7 of 11-11/0849r2 by Peter Ecclesine (Cisco Systems) July 2011 July 2011 doc.: IEEE 802.11-11/1075r1 ANA Announcements • Current ANA announced to group is 802.11-11-0270r6. (2011 Jul 12) – See https://mentor.ieee.org/802.11/dcn/11/11-11-0270-06-0000-ana-database.xls – All new requests received by end of meeting will be uploaded and announced via 802.11 WG reflector • Procedure for ANA is contained in 07/0827r0. – See http://mentor.ieee.org/802.11/public/07/11-07-0827-00-0000-assigned-number-authority-ana-mechanisms.ppt • Editorial Guidance – ANA assignments should be done before the time of moving from WG LB to Sponsor ballot. – If a resource number is not in the ANA Database, please use <ANA> in drafts! – Editors to replace any ANA controlled resources numbers with <ANA> upon incorporation of material into drafts. – Editors need to check the ANA database to determine which resources are controlled and ensure that values are requested from the ANA. Report Slide 5 Adrian Stephens, Intel Corporation from slide 3/7 of 11-11/0849r2 by Peter Ecclesine (Cisco Systems) July 2011 doc.: IEEE 802.11-11/1075r1 Editor’s discussion of 802.11 MDR • In May, we discussed holding draft reviews in preparation for requesting approval from the Sponsor • 11-11/615r0 WG 11 MEC Process, 11-09/1034r1 802.11 Style Guide, 11-09/533r1 ARC Recommendation re MIB Attribute Types & Usage, and P802.11REVmb Draft 8.0 Annex C.2 Guidelines for 802.11 MIB authors and editors • In July, after having performed the review of 11ae, 11aa and 11ad drafts, and refined the review and reporting process, – See 11-11/872 TGaa, 11-11/873 TGae and 11-11/874 TGad MEC Reports • The editors strawpolled of the draft review process – July 18 PM2 Editor’s meeting reviewed 11-11/615r3 Procedure, and a strawpoll approved the procedures therein 7-0-0. Some editorial errors were noted and resolved in 11-11/615r4 WG802.11 MEC Procedures. – We expect the process to be renamed the WG802.11 Mandatory Draft Review Process. Report Slide 6 Adrian Stephens, Intel Corporation from slide 4/7 of 11-11/0849r2 by Peter Ecclesine (Cisco Systems) July 2011 doc.: IEEE 802.11-11/1075r1 802.11 Style Guide • See 11-09-1034-03-0000-wg11-style-guide.doc • Editor’s responsibility includes checking the 2009 IEEE Standards Style Manual when creating or updating drafts. • Submissions with draft text should conform to both the WG11 Style Guide and IEEE Standards Style Manual Report Slide 7 Adrian Stephens, Intel Corporation from slide 5/7 of 11-11/0849r2 by Peter Ecclesine (Cisco Systems) July 2011 • • doc.: IEEE 802.11-11/1075r1 Amendment numbering is editorial! No need to make ballot comments on these dynamic numbers! Editor Amendment Ordering Data as of July 2011 See http://grouper.ieee.org/groups/802/11/Reports/802.11_Timelines.htm Amendment Number Task Group REVCOM Date 802.11 Amendment 8 TGv Feb 2011 802.11 Amendment 9 TGu Feb 2011 802.11 Amendment 10 TGs Sept 2011 802.11 Revision 802.11mb Mar 2012*est. 802.11-2011 Amendment 1 TGae Jun 2012 802.11-2011 Amendment 2 TGaa Jun 2012 802.11-2011 Amendment 3 TGad Dec 2012 802.11-2011 Amendment 4 TGaf Sep 2012 802.11-2011 Amendment 5 TGac Dec 2013 802.11-2011 Amendment 6 TGah July 2013 802.11-2011 Amendment 7 TGai Sept 2013 Report Slide 8 Adrian Stephens, Intel Corporation from slide 6/7 of 11-11/0849r2 by Peter Ecclesine (Cisco Systems) July 2011 July 2011 July 2011 doc.: IEEE 802.11-11/1075r1 Draft Development Snapshot Changes from last report shown in red. TG Published or Draft Baseline Documents Publi shed s mb ae aa s Y 12.0 mb Y ae Y 12.0 9.0 5.0 aa Y 11.0 9.0 3.0 5.01 ad Y 12.0 9.0 4.0 5.0 af Y 12.0 9.0 4.0 5.0 ac Y 12.0 9.0 4.0 5.0 ad af ac 9.1 4.0 1.02 3.0 1.0 1.0 ah ai Most current doc shaded green. Snapshot Source MEC Style Guide Editor Date Frame 8.0 Yes 2009 Kazuyuki Sakoda 19-Jul Frame 9.0 Yes 2009 Adrian Stephens 19-Jul OpenOffic e 3.2 Yes 2009 Henry Ptasinski 19-Jul Word Yes 2009 Alex Ashley 19-Jul Word Yes 2009 Carlos Cordero 19-Jul Frame 9.0 No 2009 Peter Ecclesine 19-Jul Frame 9.0 No 2009 Robert Stacey 19-Jul ah Minyoung Park ai Tom Siep Report Slide 9 Adrian Stephens, Intel Corporation from slide 7/7 of 11-11/0849r2 by Peter Ecclesine (Cisco Systems) July 2011 doc.: IEEE 802.11-11/1075r1 Closing Report Date: 2011-07-22 Authors: Name Company Clint Chaplin Samsung Electronics Report Address 3000 Orchard Parkway San Jose, Ca 95134 Phone email +1 408 544 2740 firstname dot lastname at gmail dot com Slide 10 Adrian Stephens, Intel Corporation from slide 1/3 of 11-11/1062r0 by Clint Chaplin, Chair (Samsung) July 2011 doc.: IEEE 802.11-11/1075r1 Abstract Closing report for WNG SC for July 2011, San Francisco, CA, USA Report Slide 11 Adrian Stephens, Intel Corporation from slide 2/3 of 11-11/1062r0 by Clint Chaplin, Chair (Samsung) July 2011 doc.: IEEE 802.11-11/1075r1 • Presentations at July 2011 meeting – Improving the Case for Wireless LAN Transmit Power Control— including to better service Mobile Telephones? (11-11-1036-00-0wngimproving-tpc-case.ppt) – Lawrence Zuckerman – Channel Contention with a Large Number of Devices (11-11-0953-00-0wngchannel-contention-with-a-large-number-of-devices.ppt) – Ed Reuss – PTC Radio and System Architecture (11-11-1032-00-0wng-positive-traincontrol-radio-and-system-architecture.ppt) – Jia-Ru Li • Minutes – 11-11-1043-00-0wng-july-2011-meeting-minutes.doc • Plans for September 2011 – 1 2 hour session Report Slide 12 Adrian Stephens, Intel Corporation from slide 3/3 of 11-11/1062r0 by Clint Chaplin, Chair (Samsung) July 2011 doc.: IEEE 802.11-11/1075r1 ARC Closing Report Date: 2011-07-22 Authors: Name Affiliations Address Phone email Mark Hamilton Polycom, Inc. 1765 W 121st Ave, Westminster, CO, 80234 720-872-7445 mark.hamilton@polycom. com Report Slide 13 Adrian Stephens, Intel Corporation from slide 1/5 of 11-11/1082r1 by Mark Hamilton, Polycom, Inc. July 2011 doc.: IEEE 802.11-11/1075r1 Abstract This document is the closing report for ARC SC, July 2011, San Francisco meeting Report Slide 14 Adrian Stephens, Intel Corporation from slide 2/5 of 11-11/1082r1 by Mark Hamilton, Polycom, Inc. July 2011 doc.: IEEE 802.11-11/1075r1 Work Completed • 802 Overview and Architecture Draft 1.2 letter ballot – Provided several comment resolutions, all accepted • https://mentor.ieee.org/802.11/dcn/11/11-11-1053-00-0arc-802rev-d12-comment-resolutions-v4.ods – Proposed text for 802.11RM Annex, accepted • https://mentor.ieee.org/802.11/dcn/10/11-10-1450-00-0arc-802rev802-11-rm-proposal.docx • Updated to Figure 4-12 in REVmb D9.0 to include 802.11u/802.21 concepts – Participated in comment resolution sessions • Raised concern about 802 Overview and Architecture definition of “end station” and “bridge” versus 802.11 concepts – Will be discussed on teleconference(s); probably submit comment on next ballot of 802 O&A • Minutes are in 11-11/1054 Report Slide 15 Adrian Stephens, Intel Corporation from slide 3/5 of 11-11/1082r1 by Mark Hamilton, Polycom, Inc. July 2011 doc.: IEEE 802.11-11/1075r1 Notable issues raised at 802 O&A sessions • Handling/mapping of EtherType in 802.11 • Error rate requirements for 802 networks • Service availability upon device insertion/removal requirements for 802 networks • See https://mentor.ieee.org/802.11/dcn/11/11-11-1054-02-0arc-arcsc-agenda-report-and-minutes.ppt for details Report Slide 16 Adrian Stephens, Intel Corporation from slide 4/5 of 11-11/1082r1 by Mark Hamilton, Polycom, Inc. July 2011 doc.: IEEE 802.11-11/1075r1 September 2011 Goals • Respond to (expected) 802 Overview and Architecture recirculation letter ballot • Formulate specific proposal for changes to “end station” and “bridge” concepts in 802 O&A Report Slide 17 Adrian Stephens, Intel Corporation from slide 5/5 of 11-11/1082r1 by Mark Hamilton, Polycom, Inc. July 2011 doc.: IEEE 802.11-11/1075r1 July 2011 Closing Report -TGmb Date: 2011-07-21 Authors: Name Dorothy Stanley Report Affiliations Address Phone Aruba Networks 1322 Crossman Ave +1 630-363Sunnyvale, CA 1389 94089 email dstanley@arubanetworks. com Slide 18 Adrian Stephens, Intel Corporation from slide 1/6 of 11-11/1092r0 by Dorothy Stanley (Aruba Networks) July 2011 doc.: IEEE 802.11-11/1075r1 Abstract This document contains the TGmb closing report for July 2011. Report Slide 19 Adrian Stephens, Intel Corporation from slide 2/6 of 11-11/1092r0 by Dorothy Stanley (Aruba Networks) July 2011 doc.: IEEE 802.11-11/1075r1 Accomplishments • Completed Third Recirculation SB Comment Resolution (D9.0) – 208 comments (+17 post SB) – Fourth Recirculation SB (20 day) to start later in August, incorporating 11s amendment • Scheduled teleconference calls on – September 13, 30 – 10am Eastern (7am Pacific), 2 hours Report Slide 20 Adrian Stephens, Intel Corporation from slide 3/6 of 11-11/1092r0 by Dorothy Stanley (Aruba Networks) July 2011 doc.: IEEE 802.11-11/1075r1 Current TGmb Plan of Record May 2008 – Issue Call for Comment/Input July 2008 – begin process input and old Interpretation requests Acknowledge previous Task Group referrals • • • Report Sept 2008 – PAR revision process started Nov 2008 – close receipt of new input Nov 2008 – WG/EC approval of PAR Revision Dec 2008 – NesCom/SASB approval PAR Revision May 2009 – First WG Letter ballot Nov 2009 – Recirc start July 2010 – Conditional Sponsor Ballot Approval from EC August 2010 – Form Sponsor Pool (45 days) – Closes Sept 14 November 2010 – Initial Sponsor Ballot completion Jan 2011 – Sponsor Recirc. Start Nov 2011 – WG/EC Final Approval March 2012 – RevCom/SASB Approval Slide 21 Adrian Stephens, Intel Corporation from slide 4/6 of 11-11/1092r0 by Dorothy Stanley (Aruba Networks) July 2011 doc.: IEEE 802.11-11/1075r1 Goals for September 2011 • Recirculation Sponsor Ballot comment resolution (D10.0) Report Slide 22 Adrian Stephens, Intel Corporation from slide 5/6 of 11-11/1092r0 by Dorothy Stanley (Aruba Networks) July 2011 doc.: IEEE 802.11-11/1075r1 References Report Slide 23 Adrian Stephens, Intel Corporation from slide 6/6 of 11-11/1092r0 by Dorothy Stanley (Aruba Networks) July 2011 doc.: IEEE 802.11-11/1075r1 TGs SF Closing Report Date: 2011-07-22 Author: Name Address Affiliation Phone Email Dee Denteneer HTC 37; 5656 AE Eindhoven; The Netherlands Philips +31 40 2749743 Dee.Denteneer@phil ips.com Report Slide 24 Adrian Stephens, Intel Corporation from slide 1/6 of 11-11/1083r1 by Dee Denteneer (Philips) July 2011 doc.: IEEE 802.11-11/1075r1 Abstract TGs closing report for the July 2011 meeting. Report Slide 25 Adrian Stephens, Intel Corporation from slide 2/6 of 11-11/1083r1 by Dee Denteneer (Philips) July 2011 doc.: IEEE 802.11-11/1075r1 Status • Discussed a number of suggestions made by the Publication Editor • Prepared the report 11-11-0990r3 to the EC to request approval to forward D12.0 to RevCom • Prepared a press release 11-11-984r7 Report Slide 26 Adrian Stephens, Intel Corporation from slide 3/6 of 11-11/1083r1 by Dee Denteneer (Philips) July 2011 doc.: IEEE 802.11-11/1075r1 Plan • To disband the group once approval to forward D12.0 to RevCom has been obtained Report Slide 27 Adrian Stephens, Intel Corporation from slide 4/6 of 11-11/1083r1 by Dee Denteneer (Philips) July 2011 doc.: IEEE 802.11-11/1075r1 Motion • Moved to approve document 11-11-0990r3 as the report to the IEEE 802 Executive Committee on the requirements for approval to forward P802.11s to RevCom, and • Request the IEEE 802 Executive Committee to forward P802.11s to RevCom. • Moved by Dee Denteneer on behalf of TGs • TGs vote: – Moved: Stephen McCann Seconded: Dan Harkins – Honorary Seconder: Donald E. Eastlake – Result: 8-0-0 Report Slide 28 Adrian Stephens, Intel Corporation from slide 5/6 of 11-11/1083r1 by Dee Denteneer (Philips) July 2011 doc.: IEEE 802.11-11/1075r1 Motion • Moved to approve document 11-11-0984r7 “TGs Press Release” and forward it to the IEEE-SA Marketing Director in preparation for ExCom ballot. To authorise the IEEE 802.11 WG chair to make any necessary editorial changes. • • Moved by Dee Denteneer on behalf of TGs • TGs vote: – Moved: Dan Harkins Seconded: Peter Yee – Result: 4-0-0 Report Slide 29 Adrian Stephens, Intel Corporation from slide 6/6 of 11-11/1083r1 by Dee Denteneer (Philips) July 2011 doc.: IEEE 802.11-11/1075r1 802.11aa – Robust Audio Video Transport Streaming San Francisco Closing Report Date: 2011-07-21 Authors: Name Affiliation Address th Phone email Ganesh.Venkatesan@intel .com [email protected] Ganesh Venkatesan Intel Corporation JF3-336 2111NE 25 Ave +1 503 334 6720 Alex Ashley NDS Ltd One London Road, Staines, Middlesex, TW18 4EX, England +44 1784 848770 Report Slide 30 Adrian Stephens, Intel Corporation from slide 1/7 of 11-11/1071r0 by Ganesh Venkatesan, Intel Corporation et al July 2011 doc.: IEEE 802.11-11/1075r1 Technical Presentations Document number Title 1 11/920 LB179 GCR Comment Resolutions Alex Ashley 2 11/923 LB179 OBSS Comment Resolutions Alex Ashley 3 11/903 LB179/MEC Editorial Comment Resolutions Alex Ashley 4 11/939 Resolution to CID #4112 Ganesh Venkatesan 5 11/941 LB179 SCS Comment Resolutions Ganesh Venkatesan 6 11/1005 Sponsor Ballot Request Ganesh Venkatesan Report Author(s) Slide 31 Adrian Stephens, Intel Corporation from slide 2/7 of 11-11/1071r0 by Ganesh Venkatesan, Intel Corporation et al July 2011 doc.: IEEE 802.11-11/1075r1 LB179 Comment Resolution Status Blank Accept Principle Editor 31 GCR 3 General 12 2, 13 30 1 OBSS 4 SCS 39 63 1 1 Interworking Total Total 16 Declined, Withdrawn 16 1 19 6 3 5 26 54 39 132 11 100% Resolved Report Slide 32 Adrian Stephens, Intel Corporation from slide 3/7 of 11-11/1071r0 by Ganesh Venkatesan, Intel Corporation et al July 2011 doc.: IEEE 802.11-11/1075r1 Joint Meeting with 802.1AVB • Discussed TGaa timeline going forward • In the March meeting we committed to bring in details on the following but the details are not ready yet: – – – – what are the .11k/v capabilities are at the devices? On what 802.11 parameters, can triggers be set? what 802.11 action frames are used to set triggers? what reports are generated? • No updates on MaxRes and STA-Bridge issues. • Provided a comment on 802.1BA • All 6 .1AVB suite of specifications are done. The team is working on AVB Rev 2 – Redundant flows to listeners, – SRP over prioritized QoS – .1AS updates to auto-detect support for .1AS over mediums like Moca. Report Slide 33 Adrian Stephens, Intel Corporation from slide 4/7 of 11-11/1071r0 by Ganesh Venkatesan, Intel Corporation et al July 2011 doc.: IEEE 802.11-11/1075r1 Change of TGaa Chair • Graham Smith (DSP Group) was unanimously elected as the chair of TGaa Report Slide 34 Adrian Stephens, Intel Corporation from slide 5/7 of 11-11/1071r0 by Ganesh Venkatesan, Intel Corporation et al July 2011 doc.: IEEE 802.11-11/1075r1 Teleconferences Aug 15, Sep 01, Oct 24, 27, 31, Nov 03 2011 1130-1330 Hrs ET Report Slide 35 Adrian Stephens, Intel Corporation from slide 6/7 of 11-11/1071r0 by Ganesh Venkatesan, Intel Corporation et al July 2011 doc.: IEEE 802.11-11/1075r1 Plans • After the July 2011 meeting – – • At the Sep 2011 Meeting – Report Complete Draft 6.0 recirculation, clean recirculation and satisfy all conditions in order to start Sponsor Ballot Start Sponsor Ballot Since the First Sponsor Ballot will be completed on Oct 17, 2011, provide WG with a status update Slide 36 Adrian Stephens, Intel Corporation from slide 7/7 of 11-11/1071r0 by Ganesh Venkatesan, Intel Corporation et al July 2011 doc.: IEEE 802.11-11/1075r1 TGac July 2011 Closing Report Date: 2011-07-21 Authors: Name Affiliations Address Phone email Osama Aboul-Magd Huawei Technologies 303 Terry Fox Drive, Kanata, ONT, K2K-3J1 613-287-1405 Osama.aboulmagd@huaw ei.com Report Slide 37 Adrian Stephens, Intel Corporation from slide 1/7 of 11-11/1086r0 by Osama Aboul-Magd (Huawei Technologies) July 2011 doc.: IEEE 802.11-11/1075r1 Abstract This document is the closing report for the TGac for the July 2011 session. Report Slide 38 Adrian Stephens, Intel Corporation from slide 2/7 of 11-11/1086r0 by Osama Aboul-Magd (Huawei Technologies) July 2011 doc.: IEEE 802.11-11/1075r1 Work Completed • Comment resolution on D1.0 – MU: 1057r0, MU comments for motioning (20110719PM2) • MU-2011-07-19-PM2 – PHY: 1069r2, PHY Comments for Motion • • • • • PHY_07_19_11 PHY_07_21_1009 PHY_07_21_1042 PHY_07_21_11 PHY_07_21_954 – COEX: 11/1067-01-00ac-lb178-coex-comments-tgac-d1-0 • COEX Ready for Motion 1 – MAC: 11/1021r3 lb178-comments-tgac-mac-d1-0 • • • • • Report MAC_07_18_AM1 MAC_07_19_AM2 MAC_07_20_PM1 MAC_07_21_AM2 MAC_07_21_PM1 Slide 39 Adrian Stephens, Intel Corporation from slide 3/7 of 11-11/1086r0 by Osama Aboul-Magd (Huawei Technologies) July 2011 doc.: IEEE 802.11-11/1075r1 Work Completed (cntd) • Number of technical comments resolved per Ad Hoc Report Ad Hoc Number of Comments MAC 81 PHY 84 MU 44 COEX 21 Total 230 + 10 Editorial Slide 40 Adrian Stephens, Intel Corporation from slide 4/7 of 11-11/1086r0 by Osama Aboul-Magd (Huawei Technologies) July 2011 doc.: IEEE 802.11-11/1075r1 Work Completed (cntd) • Approved an ad hoc meeting on September 14-16, at Seoul, Korea to advance comment resolution work. • Initiated discussion on GCMP related issues. The discussion is to be continued during the September IEEE 802.11 meeting Report Slide 41 Adrian Stephens, Intel Corporation from slide 5/7 of 11-11/1086r0 by Osama Aboul-Magd (Huawei Technologies) July 2011 doc.: IEEE 802.11-11/1075r1 September 2011 Goals • Continue with comment resolution on D1.0. Report Slide 42 Adrian Stephens, Intel Corporation from slide 6/7 of 11-11/1086r0 by Osama Aboul-Magd (Huawei Technologies) July 2011 doc.: IEEE 802.11-11/1075r1 Conference Call Times • Previously Approved – Thursday July 28 20:00 -22:00 – Thursday August 4 10:00 -12:00 • Aug 11,Aug 25, Sept 8, Sept 29, Oct 13 – 20:00 – 22:00 ET • Aug 18, Sept 1, Oct 6, – 10:00-12:00 ET Report Slide 43 Adrian Stephens, Intel Corporation from slide 7/7 of 11-11/1086r0 by Osama Aboul-Magd (Huawei Technologies) July 2011 doc.: IEEE 802.11-11/1075r1 TGad July 2011 Closing Report Date: 2011-07-21 Authors: Name Eldad Perahia Report Company Address Phone email Intel Corporation 2111 NE 25th Ave Hillsboro, OR 97124 503-712-8081 [email protected] Slide 44 Adrian Stephens, Intel Corporation from slide 1/5 of 11-11/0980r0 by Eldad Perahia, Intel Corporation July 2011 doc.: IEEE 802.11-11/1075r1 Abstract This document is the closing report for TGad for the July 2011 session. Report Slide 45 Adrian Stephens, Intel Corporation from slide 2/5 of 11-11/0980r0 by Eldad Perahia, Intel Corporation July 2011 doc.: IEEE 802.11-11/1075r1 Work Completed • Resolved all comments on LB 177 this week • TG and WG approved motion for recirculation letter ballot on D4.0 • CWPAN liaison report (11/1034) – Overview of proposed modification to TGad to support CWPAN requirements – Plan to use Aug 18 conference call to continue discussion on CWPAN proposal Report Slide 46 Adrian Stephens, Intel Corporation from slide 3/5 of 11-11/0980r0 by Eldad Perahia, Intel Corporation July 2011 doc.: IEEE 802.11-11/1075r1 Goals for September 2011 • Comment resolution on D4.0 • More planning for Sponsor Ballot Report Slide 47 Adrian Stephens, Intel Corporation from slide 4/5 of 11-11/0980r0 by Eldad Perahia, Intel Corporation July 2011 doc.: IEEE 802.11-11/1075r1 Conference call times • Previously approved conference calls – July 28, Aug 11 • 10:00 – 12:00 ET – Aug 4 • 20:00-22:00 ET • New conference calls – Not overlap with TGac – Aug 25, Sept 8, Sept 29, Oct 13 • 10:00 – 12:00 ET – Aug 18, Sept 1, Sept 15, Oct 6, • 20:00-22:00 ET Report Slide 48 Adrian Stephens, Intel Corporation from slide 5/5 of 11-11/0980r0 by Eldad Perahia, Intel Corporation July 2011 doc.: IEEE 802.11-11/1075r1 TGae Closing Report – July 2011 Date: 2011-07-20 Authors: Name Affiliations Address Phone email Michael Montemurro Research in Motion 4701 Tahoe Blvd. Mississauga, ON. Canada. L4W 0B4 +1-905-629-4746 [email protected] Report Slide 49 Adrian Stephens, Intel Corporation from slide 1/5 of 11-11/1059r0 by Michael Montemurro, Research In Motion July 2011 doc.: IEEE 802.11-11/1075r1 Abstract This document is the closing report for the TGae Task Group for the July 2011 session. Report Slide 50 Adrian Stephens, Intel Corporation from slide 2/5 of 11-11/1059r0 by Michael Montemurro, Research In Motion July 2011 doc.: IEEE 802.11-11/1075r1 Work Completed • Completed Comment Resolution for LB 180 – https://mentor.ieee.org/802.11/dcn/11/11-11-0888-08-00ae-lb-180-commentresolutions.xls • Approved recirculation LB on Draft 5.0 • Approved package for Conditional Sponsor Ballot – https://mentor.ieee.org/802.11/dcn/11/11-11-0962-02-00ae-conditional-sb-requestto-ec.ppt • Teleconferences: – Weekly teleconference on Wednesday Aug 10 at 11am ET for 1 hour. Report Slide 51 Adrian Stephens, Intel Corporation from slide 3/5 of 11-11/1059r0 by Michael Montemurro, Research In Motion July 2011 doc.: IEEE 802.11-11/1075r1 TGae Timeline – July 2011 • Initial Working Group Letter Ballot: September ‘10 • Re-circulation Working Group Letter Ballot: January ‘11 • Form Sponsor Ballot Pool: May ’11 • Mandatory Editorial Check: May ’11 • Initial Sponsor Ballot: Aug ’11 • Sponsor Ballot Recirculation: Nov ‘11 • Final WG/EC Approval: Mar ‘12 • RevCom/Standards Board Approval: June ‘12 Report Slide 52 Adrian Stephens, Intel Corporation from slide 4/5 of 11-11/1059r0 by Michael Montemurro, Research In Motion July 2011 doc.: IEEE 802.11-11/1075r1 September 2011 Goals • Resolve comments from initial Sponsor ballot • Prepare for recirculation Sponsor ballot Report Slide 53 Adrian Stephens, Intel Corporation from slide 5/5 of 11-11/1059r0 by Michael Montemurro, Research In Motion July 2011 doc.: IEEE 802.11-11/1075r1 TGaf San Francisco Closing Report Date: 2011-07-22 Authors: Name Affiliations Address Rich Kennedy Research In Motion Cisco 7305 Napier Trail +1-972-207-3554 Austin, TX 78729 170 W. Tasman Dr., +1-408-527-0815 San Jose, CA, 95134 Peter Ecclesine Report Phone email [email protected] [email protected] Slide 54 Adrian Stephens, Intel Corporation from slide 1/9 of 11-11/1068r0 by Rich Kennedy, Research In Motion July 2011 doc.: IEEE 802.11-11/1075r1 Abstract This presentation is the closing report for the eleventh face-to-face meeting of IEEE 802.11 TGaf taking place the week of July 18, 2011 at the IEEE 802 Plenary in San Francisco. Report Slide 55 Adrian Stephens, Intel Corporation from slide 2/9 of 11-11/1068r0 by Rich Kennedy, Research In Motion July 2011 doc.: IEEE 802.11-11/1075r1 Agenda • Approve meeting and teleconference minutes • Approve the LB171 comment spreadsheet in 1111/277r14 • Approve draft P802.11af D1.02 as the working draft • Approve agreed to comment resolution submissions • Review of the progress since May • Comment resolution • PHY planning Report Slide 56 Adrian Stephens, Intel Corporation from slide 3/9 of 11-11/1068r0 by Rich Kennedy, Research In Motion July 2011 doc.: IEEE 802.11-11/1075r1 TGaf Accomplishments • Resolved 151 comments – 626 of 1302 comments have Approved resolutions • Met with TGac PHY experts to discuss how TGaf can proceed prior to approval of the TGac draft • Revised the P802.11af timeline • Planned for September ad hoc in Korea, and weekly teleconferences – Tuesdays at 21:00 ET Report Slide 57 Adrian Stephens, Intel Corporation from slide 4/9 of 11-11/1068r0 by Rich Kennedy, Research In Motion July 2011 doc.: IEEE 802.11-11/1075r1 Plans for September • Ad hoc September 14 - 16 in the Korea – Sponsored by LG Electronics [Thank you!] • Complete comment resolution • Prepare draft 2.0 and ask the WG to begin our second Letter Ballot Report Slide 58 Adrian Stephens, Intel Corporation from slide 5/9 of 11-11/1068r0 by Rich Kennedy, Research In Motion July 2011 doc.: IEEE 802.11-11/1075r1 TGaf ad hoc Motion • Authorize TGaf to hold an ad-hoc meeting on September 14-16, 2011 in Seoul, ROK with the preferred venue being LG Electronics for the purpose of advancing the TGaf draft prior to the September IEEE 802 Wireless Interim in Okinawa, Japan. • Moved: Peter Ecclesine, Cisco • Second • Result: x/x/x Report Slide 59 Adrian Stephens, Intel Corporation from slide 6/9 of 11-11/1068r0 by Rich Kennedy, Research In Motion July 2011 doc.: IEEE 802.11-11/1075r1 TGaf Timeline – Updated March 2011 • • • • • • • • • Report New Initial Working Group Letter Ballot: January 2011 Second Working Group Letter Ballot: September 2011 Recirculation Letter Ballot: November 2011 Form Sponsor Ballot Pool: February 2012 Initial Sponsor Ballot: March 2012 Recirculate Sponsor Ballot: May 2012 Final WG/EC Approval: July 2012 RevCom/Standards Board Approval: September 2012 Slide 60 Adrian Stephens, Intel Corporation from slide 7/9 of 11-11/1068r0 by Rich Kennedy, Research In Motion July 2011 doc.: IEEE 802.11-11/1075r1 TGaf Timeline – Updated July 2011 • • • • • • • • • Report New Initial Working Group Letter Ballot: January 2011 Second Working Group Letter Ballot: January 2012 Recirculation Letter Ballot: May 2012 Form Sponsor Ballot Pool: June 2012 Initial Sponsor Ballot: September 2012 Recirculate Sponsor Ballot: November 2012 Final WG/EC Approval: March 2013 RevCom/Standards Board Approval: March 2013 Slide 61 Adrian Stephens, Intel Corporation from slide 8/9 of 11-11/1068r0 by Rich Kennedy, Research In Motion July 2011 doc.: IEEE 802.11-11/1075r1 Teleconferences • Weekly on Tuesdays: • Time: 21:00 ET for 120 minutes Report Slide 62 Adrian Stephens, Intel Corporation from slide 9/9 of 11-11/1068r0 by Rich Kennedy, Research In Motion July 2011 doc.: IEEE 802.11-11/1075r1 IEEE 802.11ah Closing Report for July 2011 Date: 2011-7-21 Authors: Name David Halasz Report Affiliations Aclara Address th 2315 W. 9 Street Austin, TX 78703 Phone email 330-283-2715 dave.halasz@oaktreewirel ess.com Slide 63 Adrian Stephens, Intel Corporation from slide 1/5 of 11-11/1088r0 by David Halasz, OakTree Wireless July 2011 doc.: IEEE 802.11-11/1075r1 Activity in TGah • Initial channel model document adopted! – 11-11-0968-01-00ah-channel-model-text.docx • Initial functional requirements and evaluation methodology adopted! – 11-11-0905-03-00ah-tgah-functional-requirements-and-evaluationmethodology.doc • Addition of leadership role – Joseph Teo Chee Ming - Secretary Report Slide 64 Adrian Stephens, Intel Corporation from slide 2/5 of 11-11/1088r0 by David Halasz, OakTree Wireless July 2011 doc.: IEEE 802.11-11/1075r1 Going forward • Get started on Specification framework • Updates to Channel Model And FR-EM as needed Report Slide 65 Adrian Stephens, Intel Corporation from slide 3/5 of 11-11/1088r0 by David Halasz, OakTree Wireless July 2011 doc.: IEEE 802.11-11/1075r1 Teleconferences • • • Report August 8th 6:30 PM ET 1.5 hours August 22nd 6:30 PM ET 1.5 hours September 11th 6:30 PM ET 1.5 hours Slide 66 Adrian Stephens, Intel Corporation from slide 4/5 of 11-11/1088r0 by David Halasz, OakTree Wireless July 2011 doc.: IEEE 802.11-11/1075r1 Timeline • Move out end time by 4 months – See 11/285 for details Report Slide 67 Adrian Stephens, Intel Corporation from slide 5/5 of 11-11/1088r0 by David Halasz, OakTree Wireless July 2011 doc.: IEEE 802.11-11/1075r1 IEEE 802.11TGai Closing Report Date: 2011-07-22 Authors: Name Company Address Phone email Hiroshi MANO ROOT Inc. 8F TOC2 Bldg. 7-21-11 NishiGotanda, Shinagawa-ku, Tokyo 141-0031 JAPAN +81-3-5719-7630 [email protected] Marc Emmelmann Fraunhofer FOKUS Fraunhofer FOKUS Kaiserin-Augusta-Alle 31 10589 Berlin Germany +49-30-3463 7268 [email protected] Report Slide 68 Adrian Stephens, Intel Corporation from slide 1/8 of 11-11/1090r0 by Hiroshi Mano (Root Inc.) July 2011 doc.: IEEE 802.11-11/1075r1 Abstract This presentation is the closing report for the San Francisco meeting of the IEEE 802.11 TGai. Report Slide 69 Adrian Stephens, Intel Corporation from slide 2/8 of 11-11/1090r0 by Hiroshi Mano (Root Inc.) July 2011 doc.: IEEE 802.11-11/1075r1 Plan for this week San Francisco , July 2011 • Official time slot – – – – Monday AM1,PM1 Tuesday AM2, PM1 Wednesday PM1, PM2 Thursday PM1,PM2 • Goals for the Meeting: – Review and Approve the Palm Springs and Teleconference meeting minutes – Presentation of submissions • Approve Verification of TGai Requirements • Submission of Initial technical contribution – TIME line of task group – Plan for September & Teleconference Report Slide 70 Adrian Stephens, Intel Corporation from slide 3/8 of 11-11/1090r0 by Hiroshi Mano (Root Inc.) July 2011 doc.: IEEE 802.11-11/1075r1 Accomplishments TGai • • Reviewed and Approved the Singapore and Teleconference meeting minutes Approved TGai evaluation methodology document • • 11/0811r05 TGai evaluation methodology Technical contribution – – – – – – – – – – – – • • 11/0976r1 TGai Authentication Protocol Proposal / Hitoshi Morioka (Root,Inc.) 11/0977r1 TGai Upper Layer Setup Proposal / Hitoshi Morioka (Root,Inc.) 11/1015r0 Network Selection Optimization / Gabor Bajko (Nokia) 11/1012r0 IP address configuration during association / Gabor Bajko (Nokia) 11/1014r0 IP address configuration during association / Gabor Bajko (Nokia) 11/1000r1 TGai FILS proposal / Jihyun Lee (LG) 11/1003r2 TGai Upper layer data for management frames / Hiroki Nakano (TNT) 11/1047r0 Using Upper Layer Message IE in Tgai / Ping Fang (Huawei) 11/1040r0 Editors Report / Tom Siep (CSR) 11/0976r3 TGai Authentication Protocol Proposal / Hitoshi Morioka (Root,Inc.) 11/1015r1 Optimize network selection / Marc Emmelmann (Fokus) 11/1066r1 Fast Security Setup /Robert Moskowitz (Verizon ) Approved Weekly Teleconference schedule Approved Plan for July • Submission of technical contribution • General submission Report Slide 71 Adrian Stephens, Intel Corporation from slide 4/8 of 11-11/1090r0 by Hiroshi Mano (Root Inc.) July 2011 July 2011 doc.: IEEE 802.11-11/1075r1 Motion to approve TGai evaluation methodology document • Move to accept all changes to 11-11-0811-06 and upload the revised document as rev 07 to the server , accept 11-11-0811-07 as TGai evaluation methodology document. • Mover : Marc Emmelmann (Fokus) • Second : Tom Siep (CSR) • Result 15 - 0 - 0 Report Slide 72 Adrian Stephens, Intel Corporation from slide 5/8 of 11-11/1090r0 by Hiroshi Mano (Root Inc.) July 2011 doc.: IEEE 802.11-11/1075r1 Time line of TGai PAR Approved, Modified, or Extended [Expires] 2010-12-08 – WG Letter Ballots Initial / Recirc Mar 12 / Jul 12 – Form Sponsor Ballot Pool / Reform Jan 13 – MEC Done Jan13 – IEEE-SA Sponsor Ballots Initial / Recirc Mar13/ Jul13 – Final 802.11 WG Approval Jan 14 – final or Conditional 802 EC Approval Jan 14 – RevCom & Standards Board Final or Continuous Process Approval Mar14 – ANSI Approved N/A Report Slide 73 Adrian Stephens, Intel Corporation from slide 6/8 of 11-11/1090r0 by Hiroshi Mano (Root Inc.) July 2011 doc.: IEEE 802.11-11/1075r1 Documents • Approved Minutes – May 2011 Palm Springs session minutes, 11/11-0832-00-00aimay-2011-palm-springs-session-minutes.doc – May-July Teleconference minutes, 11/11-0837-07-00ai-may-julyteleconference-minutes.doc • Approved TGai evaluation methodology – Report 11/11-0811r05 TGai evaluation methodology Slide 74 Adrian Stephens, Intel Corporation from slide 7/8 of 11-11/1090r0 by Hiroshi Mano (Root Inc.) July 2011 doc.: IEEE 802.11-11/1075r1 Thanks to all who participated! Report Slide 75 Adrian Stephens, Intel Corporation from slide 8/8 of 11-11/1090r0 by Hiroshi Mano (Root Inc.) July 2011 doc.: IEEE 802.11-11/1075r1 JTC1 ad hoc closing report (July 11) Date: 2011-7-22 Authors: Name Andrew Myles Report Company Address Phone Cisco email [email protected] Slide 76 Adrian Stephens, Intel Corporation from slide 1/10 of 11-11/1091r0 by Andrew Myles, Cisco July 2011 doc.: IEEE 802.11-11/1075r1 Abstract Closing report for JTC1 ad hoc for July 2011, San Francisco Report Slide 77 Adrian Stephens, Intel Corporation from slide 2/10 of 11-11/1091r0 by Andrew Myles, Cisco July 2011 doc.: IEEE 802.11-11/1075r1 JTC1 ad hoc focused on reporting of recent SC6 meeting • Progress in San Francisco (July 2011) – Welcomed guest • Chair of SC6 was present – Approved minutes from July in Palm Springs • 11/0955 – Reviewed extended goals • Deals with 802 to SC6 issues – Reviewed SC6 meeting in San Diego • Review attendance – IEEE 802 delegation (8 people) & ten NBs • Review agenda – Many topics not related to 802 activities Report Slide 78 Adrian Stephens, Intel Corporation from slide 3/10 of 11-11/1091r0 by Andrew Myles, Cisco July 2011 doc.: IEEE 802.11-11/1075r1 JTC1 ad hoc focused on reporting of recent SC6 meeting • Progress in San Francisco (July 2011) • Discussed proposed 8802 series withdrawal – Consensus of .1, .3, .11 participants that “international” is important & 802 should send standards to ISO as long as ISO does not amend our standards – 802.11 will not send 802.11-2007 as interim update because 802.11-2012 is very close to completion • Received WAPI report – WAPI still at NP stage & not at WD stage – A CRM will be held with 802 delegation in August, with the output to be considered by SC6 NBs in Feb 2012 – Not clear on process for WAPI project approval Report Slide 79 Adrian Stephens, Intel Corporation from slide 4/10 of 11-11/1091r0 by Andrew Myles, Cisco July 2011 doc.: IEEE 802.11-11/1075r1 JTC1 ad hoc focused on reporting of recent SC6 meeting • Progress in San Francisco (July 2011) • Received 802.1X/AE replacement report – Will ask what additional function provided by TePA? – Will need to review TePA in longer term – Not clear if proposal will proceed in SC6 • Received 802.16 security replacement report – Not clear if proposal will proceed in SC6 • Received 802.11 replacement report (Thursday) – – – – Report Explained 802.11ac and critiqued N-UHT Late news: N-UHT proposal will proceed in SC6 Late news: N-UHT is linked to 5GHz spectrum Decided need to liaise 802.11ac to SC6 ASAP Slide 80 Adrian Stephens, Intel Corporation from slide 5/10 of 11-11/1091r0 by Andrew Myles, Cisco Adrian Stephens, Intel Corporation July 2011 doc.: IEEE 802.11-11/1075r1 IEEE 802 members are encouraged to participate in their SC6 NBs • SC6 P-Members – Korea - KATS – Spain – AENOR – France – AFNOR – USA – ANSI – UK – BSI – Germany – DIN – Greece – ELOT – Russia - GOST R – Luxemburg – ILNAS – Tunisia – INNORPI Report – Japan - JISC – Kazakhstan – KAZMEMST – Kenya – KEBS – Belgium - NBN – Netherlands – NEN – China – SAC – Canada – SCC – Finland – SFS – Switzerland – SNV – Czech Republic - UNMZ Slide 81 from slide 6/10 of 11-11/1091r0 by Andrew Myles, Cisco July 2011 doc.: IEEE 802.11-11/1075r1 JTC1 ad hoc will review results of WAPI comment resolution in Okinawa • Plans for Okinawa (Sept 2011) – – – – Report Bruce Kraemer will be acting Chair Review results of WAPI comments resolution meetings Review possible liaison to SC6 regarding 8802 series ... Slide 82 Adrian Stephens, Intel Corporation from slide 7/10 of 11-11/1091r0 by Andrew Myles, Cisco July 2011 doc.: IEEE 802.11-11/1075r1 Motion to empower HoD for WAPI teleconferences • Motion – The IEEE 802.11 WG Chair is authorised to appoint a delegation to the ISO/IEC JTC1/SC6/WG1 teleconference series to resolve comments on the WAPI NP proposal, and to approve any materials used by the delegation and positions proposed by the delegation • Note: equivalent motion in ad hoc passed 21/0/0 • Moved: • Seconded: Report Slide 83 Adrian Stephens, Intel Corporation from slide 8/10 of 11-11/1091r0 by Andrew Myles, Cisco July 2011 doc.: IEEE 802.11-11/1075r1 Motion to liaise 802.11ac to SC6 • Motion – The IEEE 802.11 WG approves the following text be liaised to SC6 by the 802.11 WG Chair • The IEEE 802.11 WG has previously committed to liaise Sponsor Ballot draft standards to ISO/IEC JTC1/SC6 to allow SC6 National Bodies an early opportunity to review standards that may be submitted to SC6 for ratification under the PSDO agreement. • However, the IEEE 802.11 WG understands that a Letter Ballot draft of IEEE 802.11ac may be of interest to the National Body members of ISO/IEC JTC1/SC6, particularly as they consider the proposal from the China National Body for a New Project to develop a standard for an alternate PHY and MAC addressing similar market requirements, similar techniques and the same targeted spectrum. Report Slide 84 Adrian Stephens, Intel Corporation from slide 9/10 of 11-11/1091r0 by Andrew Myles, Cisco July 2011 doc.: IEEE 802.11-11/1075r1 Motion to empower 802.11ac to SC6 • It is the intent of the IEEE 802.11 WG to liaise a version of the draft of IEEE 802.11ac as soon as the draft passes 802.11 Working Group Letter Ballot. The 802.11ac Task Group is projected to finalize a letter-ballot by year end 2011. • Note: equivalent motion not considered in ad hoc • Moved: Rolf deVegt • Seconded: Andrew Myles Report Slide 85 Adrian Stephens, Intel Corporation from slide 10/10 of 11-11/1091r0 by Andrew Myles, Cisco July 2011 doc.: IEEE 802.11-11/1075r1 RR-TAG (IEEE 802.18) Liaison Report Date: 2011-07-22 Authors: Name Rich Kennedy Report Affiliations Address Phone email Research In Motion 7305 Napier Trail Austin, TX 78729 +1-972-207-3554 [email protected] Slide 86 Adrian Stephens, Intel Corporation from slide 1/9 of 11-11/1065r0 by Rich Kennedy, Research In Motion July 2011 doc.: IEEE 802.11-11/1075r1 Abstract This presentation is the liaison statement from the Radio Regulatory Technical Advisory Group (802.18) to the IEEE 802.11 Working Group for the July, 2011 plenary meeting in San Francisco. Report Slide 87 Adrian Stephens, Intel Corporation from slide 2/9 of 11-11/1065r0 by Rich Kennedy, Research In Motion July 2011 doc.: IEEE 802.11-11/1075r1 RR-TAG Activities • Introduced ITU-R documents of interest to IEEE 802 wireless groups • 802.11 liaison presentation on bills before the US House of Representatives on opening the 5 GHz band and on auctioning spectrum for licensed and unlicensed use • Reviewed two 802.16 documents for ITU-R Report Slide 88 Adrian Stephens, Intel Corporation from slide 3/9 of 11-11/1065r0 by Rich Kennedy, Research In Motion July 2011 doc.: IEEE 802.11-11/1075r1 ITU-R Documents • WORKING DOCUMENT TOWARDS A PRELIMINARY DRAFT NEW REPORT ITU-R SM.[SMART_GRID], WP 1A, 18-11/49r1 – Informational document on smart grid power management systems • DRAFT NEW QUESTION ITU-R [PWRGRD]/1, WP 1A, 18- 11/51r0 – Impact on radiocommunication systems from wireless and wired data transmission technologies used for the support of power grid management system Report Slide 89 Adrian Stephens, Intel Corporation from slide 4/9 of 11-11/1065r0 by Rich Kennedy, Research In Motion July 2011 doc.: IEEE 802.11-11/1075r1 ITU-R Documents [2] • PRELIMINARY DRAFT NEW RESOLUTION ITU-R[CRS], WP 1B, 18-11/52r0 – Studies on the implementation and use of cognitive radio systems (CRS) • CORRESPONDENCE GROUP ON NARROW-BAND WIRELESS HOME NETWORKING, WP 1B, 18-11/53r0 – Establishment of a correspondence group on narrow-band wireless home networking, including terms of reference • MULTIPLE GIGABIT WIRELESS SYSTEMS IN FREQUENCIES AROUND 60 GHz, WP 5A, 18-11/54r0 – Liaison statement to external organizations on “Multi-gigabit Wireless Systems Operating in Frequencies Around 60 GHz” Report Slide 90 Adrian Stephens, Intel Corporation from slide 5/9 of 11-11/1065r0 by Rich Kennedy, Research In Motion July 2011 doc.: IEEE 802.11-11/1075r1 ITU-R Documents [3] • PRELIMINARY DRAFT NEW REPORT ITU-R M.[LMS.WASN STUDY], WP 5A, 18-11/55r0 – System design guidelines for wide area sensor and/or actuator network (WASN) systems • QUALITY OF SERVICE REQUIREMENTS AND OBJECTIVES FOR WIRELESS ACCESS SYSTEMS, WP 5A, 18-11/56r0 – Liaison statement to ITU-R Working party 5D, ITU-T Study groups 12, 15 and 16, and External organizations on “Quality of Service Requirements and Objectives for Wireless Access Systems” • PRELIMINARY DRAFT NEW RECOMMENDATION ITU-R M.[LMS.WASN], WP 5A, 18-11/57r0 – Objectives, characteristics and functional requirements of wide-area sensor and/or actuator network (WASN) systems Report Slide 91 Adrian Stephens, Intel Corporation from slide 6/9 of 11-11/1065r0 by Rich Kennedy, Research In Motion July 2011 doc.: IEEE 802.11-11/1075r1 References • https://mentor.ieee.org/802.18/dcn/11/18-11-0060-00-0000spectrum-for-innovation-act.pdf • https://mentor.ieee.org/802.18/dcn/11/18-11-0061-00-0000spectrum-innovation-act.pdf • https://mentor.ieee.org/802.18/dcn/11/18-11-0062-00-0000unlicensed-spectrum-memo.pdf • https://mentor.ieee.org/802.18/dcn/11/18-11-0058-00-0000summary-of-itu-r-documents.pptx • https://mentor.ieee.org/802.18/dcn/11/18-11-0049-01-0000working-document-towards-a-preliminary-draft-new-report-itu-rsm-smart-grid.docx Report Slide 92 Adrian Stephens, Intel Corporation from slide 7/9 of 11-11/1065r0 by Rich Kennedy, Research In Motion July 2011 doc.: IEEE 802.11-11/1075r1 References [2] • https://mentor.ieee.org/802.18/dcn/11/18-11-0050-00-0000-furthercollaboration-in-the-development-of-a-preliminary-draft-newreport.docx • https://mentor.ieee.org/802.18/dcn/11/18-11-0051-00-IMTA-draftnew-question-itu-r-pwrgrd-1.pdf • https://mentor.ieee.org/802.18/dcn/11/18-11-0052-00-0000preliminary-draft-new-resolution-itu-r-crs.docx • https://mentor.ieee.org/802.18/dcn/11/18-11-0053-00-0000correspondence-group-on-narrow-band-wireless-homenetworking.docx Report Slide 93 Adrian Stephens, Intel Corporation from slide 8/9 of 11-11/1065r0 by Rich Kennedy, Research In Motion July 2011 doc.: IEEE 802.11-11/1075r1 References [3] • https://mentor.ieee.org/802.18/dcn/11/18-11-0054-00-0000multiple-gigabit-wireless-systems-in-frequencies-around-60ghz.docx • https://mentor.ieee.org/802.18/dcn/11/18-11-0055-00-0000preliminary-draft-new-report-itu-r-m-lms-wasn-study.docx • https://mentor.ieee.org/802.18/dcn/11/18-11-0056-00-0000-qualityof-service-requirements-and-objectives-for-wireless-accesssystems.docx • https://mentor.ieee.org/802.18/dcn/11/18-11-0057-00-0000preliminary-draft-new-recommendation-itu-r-m-lms-wasn.docx Report Slide 94 Adrian Stephens, Intel Corporation from slide 9/9 of 11-11/1065r0 by Rich Kennedy, Research In Motion July 2011 doc.: IEEE 802.11-11/1075r1 Smart Grid ad hoc – July 2011 Name Company Address Phone email Bruce Kraemer Marvell 5488 Marvell Lane, Santa Clara, CA, 95054 +1-321-751-3988 [email protected] Date: 21 July 2011 Discussions during July Plenary meeting in San Francisco Tuesday Abstract: Thursday Abstract: 1 – SGIP 2 - NIST PAP2 3- ITU Liaison 1- FERC 2 - NIST PAP2 3- ITU Liaisons :WG18 docs 49,51,57 Report Slide 95 Bruce Kraemer, Marvell July 2011 doc.: IEEE 802.11-11/1075r1 MEETING TOPICS Meeting document 11-11-975 1 – SGIP activities 2 - NIST PAP2 project status and plans to complete 3- ITU Liaison regarding Smart Grid WG 18 documents: 49, 51, 57 4- FERC Order dropping consideration of first 5 SGIP standards FERC concluded that there is insufficient consensus to adopt the proposed standards at this time, pointing to “nearly unanimous” comments from the industry regarding cyber security concerns and the potential unintended consequences from adopting such standards too soon Report Slide 96 Bruce Kraemer, Marvell doc.: IEEE 802.11-11/1075r1 PAP02- Phase 2-SDO Proposal –r1 Intro • Thanks to Ron Cunningham for his diligent preparation of requirements for completion of Phase 2. • We propose that it is time for the wireless SDO’s to take a more active role in constructing the analytic Proposal/Request • We request authorization from PAP2 members to form an “SDO subcommittee” committed to completing delivery of an operational analysis framework , and related descriptive text, in time for presentation to the Dec 05, 2011 SGIP board meeting. Goals • Example of deliverables include: Definition of propagation model, ability to calculate quantity of wireless equipment required to cover a given demographic/topographic area and description of statistical confidence in reported numbers Utility/GRID Input Requirements • Information regarding actor quantities by type, relative locations, topography, data traffic loads Synchronization • “SDO subcommittee” will report progress to during currently scheduled biweekly PAP2 calls Logistics • “SDO subcommittee” will convene a series of teleconferences scheduled to optimize SDO participation but open to all PAP2. SDO subcommittee will self organize , assign/delegate work. develop a milestone based project schedule. Webinar facilities will be available. Membership • “SDO subcommittee” is a volunteer group initially underwritten by ATIS, IEEE, TIA, and WiMAX. Additional wireless SDO participants will be recruited Report