Transcript 802.11
doc.: IEEE 802.11-09/0657r0 July 2009 WG11 Snapshot July ‘09 Date: 2009-07-11 Authors: Name Company Address Phone email Bruce Kraemer Marvell 5488 Marvell Ln Santa Clara, CA 95054 +1-321-4274098 [email protected] Submission Slide 1 Bruce Kraemer (Marvell) doc.: IEEE 802.11-09/0657r0 July 2009 WG11 Task & Study Group Officers Group Chair Vice Chair Technical Editor Secretary WG11 Bruce Kraemer Jon Rosdahl Adrian Stephens Terry Cole Stephen McCann Mb Matthew Gast Michael Montemurro Adrian Stephens Jon Rosdahl N Bruce Kraemer Sheung Li Adrian Stephens Jon Rosdahl P Lee Armstrong none Wayne Fisher Susan Dickey S Donald Eastlake none Kazuyuki Sakoda Stephen Rayment U Stephen McCann none Necati Canpolat -OPEN- V Dorothy Stanley none Emily Qi -OPEN- W Jesse Walker none Nancy Cam-Winget -OPEN- Z Menzo Wentink none Menzo Wentink Daniel Borges AA Ganesh Venkatesan Alex Ashley Hang Liu -OPEN- AC Osama Aboul-Magd Menzo Wentink, Joonsuk Kim -NYRQ- -OPEN- AD Eldad Perahia Vinko Erceg, John Barr -NYRQ- -OPEN- ARC David Bagby Darwin Engwer JTC1 Jesse Walker NYRQ = Not yet required, nominations are not open Submission OPEN = Candidate Nominations are open Slide 2 Bruce Kraemer (Marvell) doc.: IEEE 802.11-09/0657r0 July 2009 July 2009 WG11 Task & Study Group Officers Group Chair Vice Chair Technical Editor Secretary WG11 Bruce Kraemer Jon Rosdahl Adrian Stephens Terry Cole Stephen McCann Mb Matthew Gast Michael Montemurro Adrian Stephens Jon Rosdahl N Bruce Kraemer Sheung Li Adrian Stephens Jon Rosdahl P Lee Armstrong none Wayne Fisher Susan Dickey S Donald Eastlake none Kazuyuki Sakoda Stephen Rayment U Stephen McCann none Necati Canpolat -OPEN- V Dorothy Stanley none Emily Qi -OPEN- W Jesse Walker none Nancy Cam-Winget -OPEN- Z Menzo Wentink none Menzo Wentink Daniel Borges AA Ganesh Venkatesan Alex Ashley Hang Liu -OPEN- AC Osama Aboul-Magd Menzo Wentink, Joonsuk Kim -NYRQ- -OPEN- AD Eldad Perahia Vinko Erceg, John Barr -NYRQ- -OPEN- ARC David Bagby Darwin Engwer JTC1 Jesse Walker NYRQ = Not yet required, nominations are not open Submission OPEN = Candidate Nominations are open Slide 3 Bruce Kraemer (Marvell) doc.: IEEE 802.11-09/0657r0 July 2009 WG11 Editor Abstract / Agenda – July 2009 • • • • • • Roll Call / Contacts / Reflector Go round table and get brief status report Review action items from previous meeting Numbering Alignment process Amendment Ordering / ANA Status / Draft Snapshots MB (87% approval) discussion – 15 mins • Conference Calls Submission Slide 4 Bruce Kraemer (Marvell) doc.: IEEE 802.11-09/0657r0 July 2009 July/2009 WNG SC – Meeting Goals July 09 • Review WNG SC Plans • Scheduled Presentations – – – – – – – 802.11 Energy Consumption and Policy - Nordman QoS for Management Frames - McCann Enhancement Technology for vehicular communications - Cho WLAN Public Easements - Paine 802.11 in TVWS - Kennedy Enhanced Security for 802.11i - Harkins Broadband V2I Access for High Speed Transportation - Morioka Submission Slide 5 BruceTK Kraemer Tan (GCT (Marvell) Semi) doc.: IEEE 802.11-09/0657r0 July 2009 IEEE 802.11 ARC SC – July 2009 • Held conference calls since March sessions – Provided update on MIB usage recommendation activity in May • This week – Further MIB var recommendation discussion with .11 chairs – Continue work on MAC model – Discuss low .11 attendance impact on ARC • Agenda in document 11-09-xxxx Submission Slide 6 Bruce Kraemer (Marvell) doc.: IEEE 802.11-09/0657r0 July 2009 TGmb July 2009 Summary • LB 149 closed June 27, 2009 – 87% approval – 730 comments received and recorded in 11-09/0706r1 • 9 ad hoc groups will process comments – General, Editorial, Security, MAC operation, MAC management, framing and architecture, SAP, PHY and regulatory, and MIB – Some comments have been identified as potentially wide-ranging, and have scheduled discussions on the agenda (11-09/0732r0) • Editorial coordination meeting to be held Wednesday PM2 to synchronize baseline and post-REVmb amendments Submission Slide 7 Bruce Kraemer (Marvell) doc.: IEEE 802.11-09/0657r0 July 2009 IEEE 802.11n – July 2009 Completed Recirculation Sponsor ballots #3, 4, 5 on Drafts 10 , 11 during May, June and July – 20, 15, 1 comments received • Comment resolutions completed on conference calls • Primary session activity will be finalization of EC package • Goals – Present request to EC to submit D11.0 to RevCom/Standards Board September 9-11 (July 31 submission deadline) • TGn meeting report is submission 11-09/0659 Submission Slide 8 Bruce Kraemer (Marvell) doc.: IEEE 802.11-09/0657r0 July 2009 July2009 TGp Snapshot for July 2009 LB 151 passed • 158 affirmative votes • 27 negative votes • 26 abstention votes • ==== • 211 votes received 180 comments, 96 are editorial 6 time slots this week Proposed resolution for most comments prepared and discussed in teleconferences Should complete comment resolutions this week, go to recirculation ballot Submission Slide 9 Lee Armstrong (Armstrong Bruce Kraemer Consulting, (Marvell) Inc.) doc.: IEEE 802.11-09/0657r0 July 2009 IEEE 802.11u – July 2009 • • • • • Review of Teleconferences meetings LB 152 Re-circulation Comment Resolution Preparation for Sponsor Ballot Liaisons (incoming and outgoing) Agenda in document 11-09-0679r0 Submission Slide 10 Bruce Kraemer (Marvell) doc.: IEEE 802.11-09/0657r0 July 2009 IEEE 802.11v – July 2009 • Held 6 con calls since May 2009 session – Notes in 11-09-0677-05 • This week – Complete LB 150 Comment Resolution – Recirculation Letter Ballot – Conditional approval for Sponsor Ballot • Agenda in document 11-09-0675 Submission Slide 11 Bruce Kraemer (Marvell) doc.: IEEE 802.11-09/0657r0 July 2009 TGw July Meeting Status & Objectives • P802.11w D11.0 completed Sponsor Ballot Recirculation with no comments received – We are done • TGw to meet only once, on Wednesday PM2 – Agenda: motion to petition ExCom to progress P802.11w to RevCom for publication Submission Slide 12 Bruce Kraemer (Marvell) doc.: IEEE 802.11-09/0657r0 July 2009 IEEE 802.11z – July 2009 • The main goal for this meeting is to resolve the comments received on the second recirculation ballot on TGz draft 5.0 (LB153z) – LB153z passed with 92% approval rate – Currently at 94% approval rate, due to after ballot changes – We received 97 comments • TGz has 5 timeslots this week • We expect to start a third TGz recirculation ballot after this meeting on TGz draft 6.0 • We will be working on a request to ExCom for conditional approval to start a sponsor ballot Submission Slide 13 Bruce Kraemer (Marvell) doc.: IEEE 802.11-09/0657r0 July 2009 IEEE 802.11aa – San Francisco (July, 2009) • • Since the Montreal session: • 3 Teleconferences. Goals for the SFO Session: • OBSS • Joint meeting with 802.1AVB: • • • • Converge on the TGaa solution to OBSS Discuss TGaa goals for OBSS with TGac TSpec mapping Triggered 802.11k traffic stream/category statistics Other requirements on 802.11 that may be useful to AVB Resolve comments from Internal review of Draft D0.01 Review timeline PAR Scope Review Opening Report/Agenda in document 11-09-0667r0 Submission Slide 14 Bruce Kraemer (Marvell) doc.: IEEE 802.11-09/0657r0 July 2009 IEEE 802.11ac – July 2009 • 09-059r4 is the baseline document for the selection procedure. • 09-0161r2 is the baseline document for the usage models. • 09-308r2 is the baseline document for the channel models addendum. • Continue the work on functional requirements and evaluation. methodology (09-0451r2). • Started the discussion on the Specification Framework document. • Technical submissions and technical presentations • Review with Tgaa issues related to OBSS • Agenda in document 11-09-0723r0 Submission Slide 15 Bruce Kraemer (Marvell) doc.: IEEE 802.11-09/0657r0 July 2009 TGad – July Meeting Goals • Continue working on task group documents – Contributions to improve existing documents – Set timeline for completion of documents • Technical contributions • Joint meeting with 802.15.3c on Wed PM2 Submission Slide 16 Bruce Kraemer (Marvell) doc.: IEEE 802.11-09/0657r0 July 2009 JTC1 Ad Hoc July Meeting Status • Issues arising from Tokyo SC6 meeting – China will fast track a WAPI independent standard • Has asked for a copyright release from IEEE – SC6 member countries opposed to FDIS fast tracks as provided by the PSDO • Feel this grants IEEE more rights than member countries • Seek candidates to chair JTC1 Ad Hoc after July IEEE 802 meeting Submission Slide 17 Bruce Kraemer (Marvell) doc.: IEEE 802.11-09/0657r0 July 2009 Submission Slide 18 Bruce Kraemer (Marvell) doc.: IEEE 802.11-09/0657r0 July 2009 LB149 • • • "Should P802.11mb D1.0 be forwarded to Sponsor Ballot?". Ballot Opening Date: Monday May 18, 2009 - 23:59 ET Ballot Closing Date: Saturday Jun 27, 2009 - 23:59 ET RESPONSE RATE: 246 eligible people are in this ballot group. 155 affirmative votes 23 negative votes 29 abstention votes === 207 votes received = 84.15% valid returns = 14.01% valid abstentions • • APPROVAL RATE: 155 affirmative votes = 87.08 % affirmative 23 total negative votes = 12.92 % negative The 75% affirmation requirement has been met, Motion passes. There were 730 comments received. Submission Slide 19 Bruce Kraemer (Marvell) doc.: IEEE 802.11-09/0657r0 July 2009 LB150 • Should P802.11v D6.0 be forwarded to Sponsor Ballot? • Ballot Opening Date: Thursday Ballot Closing Date: Friday RESPONSE RATE: • May 28, 2009 - 23:59 ET June 12, 2009 - 23:59 ET 254 eligible people are in this ballot group. • • • 172 affirmative votes 20 negative votes 38 abstention votes === 230 votes received = 90.55% valid returns = 16.52% valid abstentions APPROVAL RATE: 172 affirmative votes = 89.58 % affirmative 20 total negative votes = 10.42 % negative The 75% affirmation requirement has been met, Motion passes. There were 140 comments received. Submission Slide 20 Bruce Kraemer (Marvell) doc.: IEEE 802.11-09/0657r0 July 2009 • • • LB151 Should P802.11p D7.0 be forwarded to Sponsor Ballot?". Ballot Opening Date: Friday May 29, 2009 - 23:59 ET Ballot Closing Date: Saturday Jun 13, 2009 - 23:59 ET RESPONSE RATE: 232 eligible people are in this ballot group. 158 affirmative votes 27 negative votes 26 abstention votes === 211 votes received = 90.95% valid returns = 12.32% valid abstentions • • APPROVAL RATE: 158 affirmative votes = 85.41 % affirmative 27 total negative votes = 14.59 % negative The 75% affirmation requirement has been met, Motion passes. There were 184 comments received. Submission Slide 21 Bruce Kraemer (Marvell) doc.: IEEE 802.11-09/0657r0 July 2009 LB152 • • • Should P802.11u D7.0 be forwarded to Sponsor Ballot?". Ballot Opening Date: Friday Jun 04, 2009 - 23:59 ET Ballot Closing Date: Friday Jun 19, 2009 - 23:59 ET RESPONSE RATE: 213 eligible people are in this ballot group. 142 affirmative votes 19 negative votes 33 abstention votes === 194 votes received = 91.08% valid returns = 17.01% valid abstentions • • • APPROVAL RATE: 142 affirmative votes = 88.20 % affirmative 19 total negative votes = 11.80 % negative The 75% affirmation requirement has been met, Motion passes. There were 225 comments received. Submission Slide 22 Bruce Kraemer (Marvell) doc.: IEEE 802.11-09/0657r0 July 2009 LB153 • • • "Should P802.11z D5.0 be forwarded to Sponsor Ballot?". Ballot Opening Date: Monday Jun 08, 2009 - 23:59 ET Ballot Closing Date: Tuesday Jun 23, 2009 - 23:59 ET RESPONSE RATE: 254 eligible people are in this ballot group. 183 affirmative votes 15 negative votes 34 abstention votes === 232 votes received = 91.34% valid returns = 14.66% valid abstentions • • • APPROVAL RATE: 183 affirmative votes = 92.42 % affirmative 15 total negative votes = 07.58 % negative The 75% affirmation requirement has been met, Motion passes. There were 97 comments received. Submission Slide 23 Bruce Kraemer (Marvell) doc.: IEEE 802.11-09/0657r0 July 2009 TGn - Sponsor Ballot Recirc #3 • IEEE P802.11n 15 day Recirculation Sponsor Ballot #3 asked the question “Should P802.11n Draft 10.0 be forwarded to RevCom?” • Ballot Opening Date: Friday May 15 , 2009 - 23:59 ET Ballot Closing Date: Saturday May 30, 2009 - 23:59 ET • RESPONSES: 277 eligible people are in this ballot group. 190 affirmative votes 26 negative votes 17 abstention votes ======= 237 votes received = 86 % valid returns = 7 % valid abstentions APPROVAL RATE: 190 affirmative votes = 26 total negative votes = Submission 88.0 % affirmative 12.0 % negative Slide 24 Bruce Kraemer (Marvell) doc.: IEEE 802.11-09/0657r0 July 2009 TGn - Sponsor Ballot Recirc #4 • IEEE P802.11n 15 day Recirculation Sponsor Ballot #4 asked the question “Should P802.11n Draft 11.0 be forwarded to RevCom?” • Ballot Opening Date: Friday Ballot Closing Date: Saturday June 05 , 2009 - 23:59 ET June 20, 2009 - 23:59 ET • RESPONSES: 277 eligible people are in this ballot group. 195 affirmative votes 22 negative votes 17 abstention votes ======= 238 votes received = 83 % valid returns = 7 % valid abstentions APPROVAL RATE: 195 affirmative votes = 22 total negative votes = Submission 89.9 % affirmative 10.1 % negative Slide 25 Bruce Kraemer (Marvell) doc.: IEEE 802.11-09/0657r0 July 2009 TGn - Sponsor Ballot Recirc #5 • IEEE P802.11n 10 day Recirculation Sponsor Ballot #5 asked the question “Should P802.11n Draft 11.0 be forwarded to RevCom?” • Ballot Opening Date: Tuesday Ballot Closing Date: Friday June 23 , 2009 - 23:59 ET July 03, 2009 - 23:59 ET • RESPONSES: 277 eligible people are in this ballot group. 198 affirmative votes 20 negative votes 17 abstention votes ======= 238 votes received = 86 % valid returns = 7 % valid abstentions APPROVAL RATE: 198 affirmative votes = 20 total negative votes = Submission 90.8 % affirmative 9.2 % negative Slide 26 Bruce Kraemer (Marvell) doc.: IEEE 802.11-09/0657r0 July 2009 TGW SB3 • • • • “Should P802.11w Draft 10.0 be forwarded to RevCom?” Ballot Opening Date: Sunday Ballot Closing Date: Sunday RESPONSE RATE: May 31 , 2009 - 23:59 ET June 14, 2009 - 23:59 ET 148 eligible people are in this ballot group. 107 affirmative votes 8 negative votes 9 abstention votes ======= 124 votes received = 83.8 % valid returns = 7.3 % valid abstentions • • APPROVAL RATE: 107 affirmative votes = 93.0 % affirmative 8 negative votes = 7.0 % negative Motion passes 15 comments received have been posted in document 11-09-0683 r0 Submission Slide 27 Bruce Kraemer (Marvell) doc.: IEEE 802.11-09/0657r0 July 2009 TGW SB4 • • • • “Should P802.11w Draft 11.0 be forwarded to RevCom?” Ballot Opening Date: Thursday June 18 , 2009 - 23:59 ET Ballot Closing Date: Sunday June 28, 2009 - 23:59 ET RESPONSE RATE: 148 eligible people are in this ballot group. 110 affirmative votes 6 negative votes 9 abstention votes ======= 125 votes received = 84.5 % valid returns = 7.2 % valid abstentions • • APPROVAL RATE: 110 affirmative votes = 94.8 % affirmative 6 negative votes = 5.2 % negative Motion passes Zero comments were received during this ballot. Submission Slide 28 Bruce Kraemer (Marvell)