Document 7323263
Download
Report
Transcript Document 7323263
Federal Aviation
Administration
FAA Global Navigation
Satellite System (GNSS)
Program Plans and
Status
GPS/WAAS/LAAS
Leo Eldredge, GNSS Program Manager
Federal Aviation Administration (FAA)
Space Enterprise Council
March 14, 2008
Peak Aircraft Traffic Over The US
Global Navigation Satellite System (GNSS) Program Plans and Status
February 28, 2008
Federal Aviation
Administration
2
Future Planning Assumptions
• By 2025 , Aviation is Expected to
Increase By a Factor of 2.7
• The NAS Will Transition to Satellite
Navigation Technology
– Enable Performance-Based Navigation
Services Capability RNAV & RNP
– Position Navigation Timing (PNT) is a
Critical Enabler for NextGen
• Legacy Services With Negative
Benefits/Cost Will Eventually Be
Removed
Global Navigation Satellite System (GNSS) Program Plans and Status
February 28, 2008
Federal Aviation
Administration
3
Global Navigation Satellite System (GNSS)
Global Navigation Satellite System (GNSS) Program Plans and Status
February 28, 2008
Federal Aviation
Administration
4
Global Positioning System (GPS)
Space Segment
•
•
•
•
•
•
24 Orbit Slots
6 Orbital Planes
4 Satellites Per Plane (Nominal)
55 Degrees Inclination
Orbit at 10,800 Miles
Orbits Once Every 12 Hours
Control Segment
• 6 GPS Monitor Sites
• 11 NGA Monitor Sites
• 2 Operational Control Centers
User Segment
• Military & Civil Receivers
• Precise Positioning Service (PPS)
• Standard Positioning Service (SPS)
Global Navigation Satellite System (GNSS) Program Plans and Status
February 28, 2008
Federal Aviation
Administration
5
FAA Satellite Navigation Program
Global Navigation Satellite System (GNSS) Program Plans and Status
February 28, 2008
Federal Aviation
Administration
6
Continuous Descent
Aviation Benefits
© 2002 The MITRE C
LNAV/VNAV
350’
LPV 250’
LPV 200’
3o
Global Navigation Satellite System (GNSS) Program Plans and Status
February 28, 2008
Federal Aviation
Administration
7
WAAS Architecture
38 Reference
3 Master
4 Ground
Stations
Stations
Earth Stations
2 Geostationary
2 Operational
Satellite Links
Control Centers
Global Navigation Satellite System (GNSS) Program Plans and Status
February 28, 2008
Federal Aviation
Administration
8
GEO Satellites
PanAmSat
133W
Telesat
107W
Global Navigation Satellite System (GNSS) Program Plans and Status
February 28, 2008
Federal Aviation
Administration
9
Vertical Service Coverage
Global Navigation Satellite System (GNSS) Program Plans and Status
February 28, 2008
Federal Aviation
Administration
10
WAAS Approach Procedures
LPVs: 1028
LNAV/VNAVs: 1275
WAAS Procedures to be Published to All
Instrument Runways in the NAS by 2018
Global Navigation Satellite System (GNSS) Program Plans and Status
February 28, 2008
Federal Aviation
Administration
11
WAAS Avionics Status
• General Aviation
– Over 28,000 WAAS Avionics Units Sold
• Business & Regional Aircraft FMS Avionics
– Rockwell-Collins: Expecting Approval in FY2008
– Canadian Marconi Corporation: by December 2008.
– Universal Navigation Systems: Approved in 2007
• Air Carrier & Cargo Aircraft
– Southwest Airlines Equipping 200 Boeing 737 with
GPS/WAAS
– Federal Express (FEDEX) Equipping 300 Aircraft
with WAAS Avionics
• Helicopter Aircraft Implementing WAAS
Global Navigation Satellite System (GNSS) Program Plans and Status
February 28, 2008
Federal Aviation
Administration
12
WAAS In Use By Non-Aviation Users
Local Area Augmentation System (LAAS)
Global Navigation Satellite System (GNSS) Program Plans and Status
February 28, 2008
Federal Aviation
Administration
14
Current Activities
•
•
•
•
•
Integrity Analysis and Prototype Development
LAAS System Design Approval (SDA) Reviews
LAAS Operational Implementation at Memphis Airport
International Cooperation and Development
CAT-III Research & Development Activities
Global Navigation Satellite System (GNSS) Program Plans and Status
February 28, 2008
Federal Aviation
Administration
15
LAAS/GBAS International Efforts
Rio De Janeiro, Brazil
Agana, Guam
Sydney, Australia
Malaga, Spain
Frankfurt, Germany
Memphis, Tenn.
Global Navigation Satellite System (GNSS) Program Plans and Status
February 28, 2008
Bremen, Germany
Federal Aviation
Administration
16
Summary
• The FAA is Implementing Satellite Navigation
Systems Needed to Support Performance Based
Navigation and NextGen
• The WAAS Program Has Matured Through
Development and is Rapidly Progressing Through
Operational Implementation
• The First Certified LAAS is Expected In Late 2008
• Satellite Navigation is a Cornerstone of the Next
Generation Air Transportation System (NextGen)
Global Navigation Satellite System (GNSS) Program Plans and Status
February 28, 2008
Federal Aviation
Administration
17
FAA Priorities for GPS
1. Sustainment of the GPS Constellation to Meet
Commitments in the GPS Standard Positioning
Service Performance Standard (SPS PS)
2. Baseline GPS Modernization Schedule to Support
Long Term Planning and Decision Making
3. Provision of a Constellation of Dual Frequency (L1
& L5) Satellites
–
–
Combination GPS Block IIF and GPS-III Satellites
Significant Improvement in Availability and Reliability
4. Continually Look at Improved Service Through
GPS Modernization
–
–
Larger Constellation Size Would Improve Service for Aviation
Improved Accuracy, Availability, and Integrity
Global Navigation Satellite System (GNSS) Program Plans and Status
February 28, 2008
Federal Aviation
Administration
18
Questions
http://gps.faa.gov
Global Navigation Satellite System (GNSS) Program Plans and Status
February 28, 2008
Federal Aviation
Administration
19