Market Area Manager Panel, Vienna, 20/11/2012

Welcome!

Agenda

 Update: Administration of Balance Groups  Roadshows Balancing and Data Exchange  Status Update Balancing Network Code  Update Capacity platform  Update Coordinated Network Development Plan 2012/2013  Agora  Implementation of the Market area manager’s duties – status quo and outlook  Any other business • Next meeting 2 November 20th, 2012

Update: Administration of Balance Groups

3 November 20th, 2012

Administration of BG (1)

90 80 70 60 50 40 30 20 10 0 4 November 20th, 2012 82

Registration procedures 15/11/2012

3 Anträge insgesamt davon abgeschlossene Registrierungen

Administration of BG (2)

15 10 5 25 20 20 0 10 23 11 1 1 10 1 2 1 5 November 20th, 2012

Administration of BG (3)

45 40 35 30 25 20 15 10 5 0 6 November 20th, 2012 42

Contract types 15/11

7 31 FL FL+VG FL+VG+EKV

Administration of BG (4)

30 20 10 0 80 70 60 50 40 7 November 20th, 2012 72 Bilanzkonten

Balance group / Sub balance accounts

8 Subbilanzkonten

EIC-Administration (1)

X-Codes international X-Codes national Y-Codes W-Codes Z-Codes Work in progress

8 November 20th, 2012

15/11

18 Published: Entso-E 9 106 16 30 3 Published: Gas Connect Austria Published: Gas Connect Austria Published: Gas Connect Austria Published: Gas Connect Austria

EIC-Adminstration (2) – rejections

X-Codes international Y-Codes national X-Codes national 15/11

6 4 4 9 November 20th, 2012

Road Show Ex-ante Balancing

10 November 20th, 2012

Road Show Ex-ante Balancing

 Title of the road show: “Ex-ante Balancing and corresponding information provision in the Market Area East ”.

 Held on October 3 rd and 10 th in Floridotower in German with simultaneous English translation  ~ 80 participants per road show  Presentations held by GCA (in it’s role as MAM and TSO) and CEGH, moreover presence on panel (and Q&A) of BOG and TAG  Overall feedback exclusively positive for road show on Oct 3 rd , mostly positive for roadshow on Oct 10 th 11 November 20th, 2012

Status Balancing Network Code

12 November 20th, 2012

Status Balancing Network Code

Date 28 September Content

End of Stakeholder support process (SSP) on refined draft Network Code: mostly positive feedback from stakeholders

9 October 25 October 26 October 26 January

ENTSOG Board approves final draft Network Code ENTSOG General Assembly approves of final draft Network Code ENTSOG submits Network Code to ACER and the EC Deadline for ACER to submit reasoned opinion to ENTSOG on Balancing Network Code 13 November 20th, 2012

Capacity platform – European Platform Initiative

Capacity platform – European Platform Initiative (EPI) – Current Status and Next Steps Planned

16 October 2012 25 October 2012 6 November 2012 19 November 2012 4 December 2012 Introduction of Trac-X (EPI) regarding the functional and technical perspective including planned interfaces of the capacity platform Meeting of Management Board members of BOG, TAG and GCA with representatives of Trac-X (EPI) Decision: All 3 Austrian TSOs intend to become shareholders from the first day Meeting of Trac-X with corresponding NRAs and TSOs presenting progress of EPI project Submission of the respective Governance Documents by Trac-X (EPI) Conclusion of contracts regarding acquisition of shares in the new company

Coordinated Network Development Plan 2012/2013

16 November 20th, 2012

Coordinated NEP 2013 – 2022 Current Status and Next Steps Planned

31 October 2012 09 November 2012 23 November 2012

tbd tbd tbd

Sending of the CNEP 2013 – 2022 by MAM to the TSOs for submission to E-Control Publication of the Consultation Version of the CNEP 2013 – 2022 by E-Control - End of consultation phase - Publication of consultation responses online by E Control

Distribution of consultation responses to the respective TSO by MAM, with the request to submit the updated version of the NEP to MAM Incusion of updated NEPs in the CNEP 2013 – 2022 by MAM Sending of the updated CNEP 2013 – 2022 by MAM to the TSOs for submission to E-Control

17 November 20th, 2012

Coordinated NEP 2014 – 2023 Ongoing Preparation

Public Consultation “Szenariorahmen” for the German NEP-Gas 2013 @ BNetzA /Köln Conference Renewable Energy @ Casineum Velden (KELAG) • Request for including the congestion in Oberkappel in the NEP-Gas 2013 • Request for adapting the pressure for modelling the gas flows to Austria (Oberkappel) at least to the pressure agreed in the Pressure Support Agreement • Current developments (increasing efficiency in electricity consumption vs. investments) in the Electricity Market should be reflected in the CNEP 2014 – 2023 in order to broaden the CNEP‘s perspective 18 November 20th, 2012

Agora

19 November 20th, 2012

Capacity assignment § 170 GWG11

 Update AB RZF BGV V04 MG Ost: www.aggm.at

 Regelwerk  Allg. Bedingungen des VGM  Update key date • • Anmeldungstichtag:

30.11.2012

Zuteilungsstichtag: 7.12.2012

 Information • 19.11.2012 per e-mail • 20.11.2012 per letter to BGV 20 November 20th, 2012

Implementation of the Market area manager’s duties – status quo

21 November 20th, 2012

Implementation – Status quo (1)

Duties § 14 (1)

1. ensure the establishment of and non-discriminatory access to the virtual trading point and the designation of the operator of the virtual trading point in accordance with section 68, and cooperate with it; 2. manage the balance groups which are active in the market area; this includes, without limitation, informing market participants regarding the balance group system and balancing rules, assigning balance group IDs in cooperation with the clearing and settlement agent, organising the conclusion of the contracts required according to section 91 para. 2 item 1 on behalf and for account of the relevant contract parties in accordance with the market rules; 3. coordinate system operation and the use of linepack as well as the use of physical balancing energy together with the market area’s distribution area manager, mainly via the virtual trading point, with the aim to minimise the need for physical balancing energy by efficiently deploying control energy; • • • • • •

Fulfilled?

VTP:  Contract for cooperation: WIP Online platform registration:  – EIC / local issuing office:  Balancing management from 1/1/2013: WIP Balancing management from 1/1/2013: WIP 22 November 20th, 2012

Implementation – Status quo (2)

Duties § 14 (1)

4. establish a uniform methodology for the calculation and announcement of capacity at the entry/exit points of the market area’s transmission network pursuant to sections 34 and 35; the methodology shall be subject to approval by the regulatory authority. Changes shall be made upon the request of the regulatory authority; 5. organise the establishment and operation of the online platform for offering capacity pursuant to section 39 and for publishing information about the market area pursuant to Regulation (EC) No 715/2009; 6. on the basis of a variety of load-flow scenarios and together with the transmission system operators and the distribution area manager, draw up a common forecast of the capacity need and utilisation in the market area’s transmission network over the next ten years; 7. draw up a coordinated network development plan; • • • • •

Fulfilled?

Calculation model:  European initiative:  Effective from 1/4/2013: WIP Load flow scenarios: WIP KNDP:  23 November 20th, 2012

Implementation – Status quo (3)

Duties § 14 (1)

8. coordinate measures to overcome physical congestions with the distribution area manager, the system operators and storage system operators in the market area; 9. enter into contracts on the exchange of data with the distribution area manager, the system operators, the balance responsible parties, the operator of the virtual trading point, the clearing and settlement agent and other market participants in line with the market rules; 10. submit its general terms and conditions to the regulatory authority for approval pursuant to section 16; 11. coordinate maintenance of the transmission and distribution network together with the distribution area manager pursuant to section 18 para. 1 item 28 such that the impact on system users is kept as small as possible; • • • • • •

Fulfilled?

Measures: if required Contracts: WIP Contracts: WIP GTC:  Measures: WIP Contracts: WIP 24 November 20th, 2012

Implementation – Status quo (4)

Duties § 14 (1)

12. determine and publish the calorific values for the market area, based on the data submitted by the system operators; 13. coordinate the nomination procedure for the transmission system, including the exchange of nominations with the operator of the virtual trading point; 14. organise the financial settlement of imbalance charges in the transmission network together with the operator of the virtual trading point and the transmission system operators.

• • • • •

Fulfilled?

Effective from 1/1/2013 IT-solution:  Effective from 1/1/2013 IT-solution:  VTP organises the settlement:  25 November 20th, 2012

Any other business

26 November 20th, 2012

Any other business

Next meeting: 19.3.2013, 1-3 p.m. , FLO 16.12