Transcript Document
Scope • Improve Intersection Operations and Safety • Widen Roadways and Provide Additional Turn Lanes • Increase Turn Lane Lengths for Storage and Deceleration • Upgrade Curb Ramps to Meet ADA Standards Proposed Typical Section City of South Daytona • • • FPN 428983-1-58-01 US 1 Streetscape Improvements (Beville Road to Ridge Boulevard) LAP with City of South Daytona Project Includes – Curb Replacement – Removal of On-Street Parking – Lane Realignment – Addition of Bike Lanes Intersection Improvements Proposed Typical Section SR 5 (US 1) Proposed Typical Section Big Tree Road Costs • Design – Approximately $315,000 • Right-of-Way – TBD • Construction – Approximately $750,000 • Project is unfunded for right-of-way and construction Schedule • • • • Design Initiated – April 2011 Letting Date – TBD Construction Begin – TBD Construction Complete – TBD Comment Sheets • Comment Sheets Available – Please Complete Here or Mail before May 8th