Transcript Slide 1
Montoursville Area High School – Additions and Renovations Act 34 Public Hearing February 24, 2015 TABLE OF CONTENTS Page 1. AGENDA 2 2. INTRODUCTION 3 3. PROJECT NEED 4 4. SUMMARY OF DISTRICT OWNED BUILDINGS AND LAND (A-09) 6 5. OPTIONS CONSIDERED 7 6. PROJECT DESCRIPTION 8 7. SITE PLAN AND FLOOR PLANS 9 8. PROJECT ACCOUNTING BASED ON ESTIMATES (PLANCON D-02 and 03) 14 9. OTHER DETAILED COSTS (PLANCON D-04) 16 10. ESTIMATED MAXIMUM REIMBURSABLE PROJECT AMOUNT (PLANCON D-08 and D-09) 17 11 ACT 34 MAXIMUM BUILDING CONSTRUCTION COST (PLANCON D-20) 19 12. ANALYSIS OF FINANCING ALTERNATIVES 20 13. COMPARISON OF LONG TERM FINANCING METHODS 21 14. BOARD RESOLUTION OF MAXIMUM BUILDING COST AND PROJECT COST 28 15. PUBLIC HEARING NOTICE 29 AGENDA 1. CALL TO ORDER / INTRODUCTION Tom P. McNamara Board President 2. HEARING, DULY CONSTITUTED Murphy, Butterfield, & Holland Fred Holland Solicitor 3. PURPOSE OF THE MEETING (Need for the Project) Dr. Timothy Bowers Superintendent of Schools 4. PROJECT DESCRIPTION Crabtree, Rohrbaugh & Associates Paul Taylor Director of Education Architecture 5. FINANCIAL ANALYSIS RBC Capital Markets Stephen Flaherty Financial Advisor 6. PUBLIC COMMENT Question and Answer Period A. B. C. Pre-registered speakers / comments Please raise hand, stand, and state name, address One question at a time - five minute limitation per speaker Montoursville Area High School – Additions and Renovations ` Introduction This public hearing is being held in accordance with Act 34 of 1973 of the Commonwealth of Pennsylvania. The purpose is to have the District Administration, Architect and Financial Advisor present a proposal for additions and renovations to the existing High School. The specific purposes for this hearing are as follows: 1. A description of the need for the project by reviewing supporting factors. 2. Review the various options considered by the Board prior to the decision to proceed with the current project proposal. 3. A description of the project that meets educational/community functions including energy efficiency and technology upgrades. 4. Present the estimated maximum building construction cost, total project cost, indirect costs, financing methods and estimate of local tax impact. 5. Provide school district residents an opportunity to offer comments and written testimony concerning the project. Montoursville Area High School – Additions and Renovations ` Need for the Project Existing Educational Program deficiencies include, but are not limited to: Inadequate space for o Science o Physical Education o Music o Drama/Auditorium/Stage o Art o Guidance o Student Commons/Flexible-Learning Spaces o Community Functions Inefficient Departmental Organization due to existing building limitations Existing Building Physical deficiencies include, but are not limited to: Inadequate Security due to limited control of building entrances Inadequate Safety relative to current building codes (fire suppression/alarm, ventilation) Heating, ventilation and cooling systems near end of service life Electrical and plumbing systems near end of service life Inadequate Energy Efficiency in building components ADA accessibility Options Considered High School Option 1 $37.8 Million Maintains a majority of existing building. Additions = 116,775 SF New Maintenance building required off-site OPTIONS CONSIDERED TheSchool DistrictOption analyzed that explored the utilization of existing High 2 several scenarios $42.6 Million district buildingsa to meet the desired high school educational program. Maintains less of existing building. Additions = 200,000 SF These construction options sought to maximize New Maintenance building required off-site opportunities and minimize the constraints of the building site and structure. High School Option 3 $43.3 Million Although each offered a possible solution, most offered undesirable building New School at new site organizations, restricted sites, and/or compromises to the educational program. High School Option 4 $22.0 Million Renovations only, no additions. 1. Existing High School - Additions and Renovations High School Option 5 $36.0 Million Option Selected 2.Majority of High School is new three-story structure New Elementary School Additions = 135,000 SF Maintenance building remains on site 3.Existing remains New Gymnasium High School (Option selected) This option was considered to have the best combination of: Overall to the District Reasons Option 5 wascost selected: Educational Program Improvements Best use of existing building value new educational Consolidating ageand appropriate groups space organization Long term three-story value for construction dollars spent Compact, energy efficient, building maximized space for practice fields and parking Least disruptive to educational process Best long-term value for dollars spent Option 1: Additions & Renovations Site Plan / First Floor Plan N Arch St. Mulberry St. 38 Option 2: Additions & Renovations Site Plan / First Floor Plan 43 Option 3: New High School Site and First Floor Plan 43 Option 4 11 22 Montoursville Area High School – Additions and Renovations ` Need for the Project Existing Science Rooms Planned Science Rooms Montoursville Area High School – Additions and Renovations ` Need for the Project Existing Auditorium Planned Auditorium Option 5: Additions and Renovations Montoursville Area High School ARCH STREET MULBERRY STREET 14 Site Plan Montoursville Area High School – Additions and Renovations ` OPTIONS CONSIDERED PROJECT DESCRIPTION The District analyzed several scenarios that explored the utilization of existing Summary ofbuildings Site district to meet the desired high school educational program. Site Size / Condition: Acres (Existing) These construction15.4 options sought to maximize opportunities and minimize the constraints of the School building site and structure. Current Site Usage: Wetlands: None Although each Electricity, offered a possible solution,Gas most offered undesirable building Available Utilities: Sewer, Water, Service organizations, restricted and/or compromises Proposed Community Use sites, Areas: Open Playfields to the educational program. Parking Count: Estimated 314 spaces Safety/Security Measures: 1. Existing High School - Additions and Renovations School Administration Office location allows view to main entrance and parking areas Separated and Bus Drop Off / Pick Up Areas 2. New Auto Elementary School Separate Loading Dock and Receiving Area 3. New High School (Option selected) option was considered SummaryThis of Proposed Project to have the best combination of: Overall cost to the Additions and renovations toDistrict High School of Educational Program SF Improvements Demolition approx. 125,000 of existing structure Approx. 135,000 new SFage andappropriate renovations to approx. 74,815 SF Consolidating groups One, Two Three Levelfor Masonry Structure and Long term value construction dollars spent Total Square Footage: approx. 209,815 SF Least disruptive to educational process Montoursville Area High School – Additions and Renovations ` Program Spaces include: General Classrooms Science Labs Special Education Classrooms Art Rooms Music Rooms Small Group Instruction Library Technology Labs Business New Building Systems: Heating Ventilation Air Conditioning Electrical Plumbing Windows/Doors Family and Consumer Science Foreign Language Gymnasium Auxiliary Gymnasium Auditorium Administration Offices Cafeteria and Kitchen Fire Suppression Fire Alarm Emergency Lighting Data/Communications Clock System Interior Finishes Montoursville Area High School – Additions and Renovations ` Montoursville Area High School – Additions and Renovations ` Intentionally Blank FIRST FLOOR PLAN EXISTING AND NEW FIRST FLOOR PLAN SECOND FLOOR PLAN THIRD FLOOR PLAN Main Entrance Classroom Wing District Administration Entrance 1 Bird’s eye District Administration 1 District Administration Entrance 2 Stadium Entrance PROJECT ACCOUNTING BASED ON ESTIMATES D istrict/C T C : P rojectN am e: Montoursville Area High School PROJECT COSTS A. NEW Structure Costs Architect's/Engineer's Fee 1. 2. EPA-Certified Project Designer's Fee on Asbestos Abatement 3. TOTAL - Architect's Fee TOTAL 15,336,443 910,760 16,247,203 4,990,353 3,033,993 8,024,346 1,281,722 839,190 2,120,912 3,455,747 1,613,826 5,069,573 X X X X X X 35,000 35,000 25,064,265 6,432,769 31,497,034 on Structure 1,715,254 428,251 2,143,505 X X X X X X X X X X X X 10,036 10,036 1,715,254 438,287 2,153,541 427,426 142,475 569,901 No Fee No Fee 427,426 142,475 569,901 27,206,945 7,013,531 34,220,476 12,500 12,500 25,000 Fixtures and Equipment 1. Movable Fixtures and Equipment 2. Architect's Fee 3. TOTAL - Movable Fixtures & Equipment D. STRUCTURE COSTS, ARCHITECT'S FEE, MOVABLE FIXTURES & EQUIPMENT TOTAL (A-9 plus B-3 and C-3) E. EXISTING (include site development) 1. General (R ep ort costs for san itary sew ag e d isp osal on lin e E -1.) 2. Heating and Ventilating 3. Plumbing (R ep ort costs for san itary sew ag e d isp osal on lin e E -1.) 4. Electrical 5. Asbestos Abatement (D04, line C-3) 9. TOTAL-Structure Costs (A-1 to A-7-Subtotal plus A-8-c) B. ARCHITECT'S FEE C. (1 of 2) P roject#: Site Costs 1. Sanitary Sewage Disposal 4. Architect's/Engineer's Fee for Sanitary Sewage Disposal 6. TOTAL - Site Costs F. STRUCTURE COSTS, ARCHITECT'S FEE, MOVABLE FIXTURES & EQUIPMENT, AND SITE COSTS - TOTAL (D plus E-6) 750 750 1,500 13,250 13,250 26,500 27,220,195 7,026,781 34,246,976 PROJECT ACCOUNTING BASED ON ESTIMATES D istrict/C T C : P rojectN am e: (2 of 2) P roject#: Montoursville Area High School TOTAL PROJECT COSTS (CONT.) G. Additonal Construction Related Costs 1. 4. 5. 6. 8. 9. H. Project Supervision (inc. Asbestos Abatement Project Supervision) Architectural Printing Test Borings Site Survey Contingency TOTAL - Additional Construction-Related Costs Financing Costs FOR THIS PROJECT ONLY 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. I. Underwriter Fees Legal Fees Financial Advisor Bond Insurance Paying Agent/Trustee Fees and Expenses Capitalized Interest Printing CUSIP & Rating Fees Other TOTAL-Financing Costs 11,662 14,500 500,000 1,153,024 88,000 140,000 88,000 316,000 40,000 40,000 40,000 120,000 26,125 47,000 26,125 99,250 1,500 1,500 1,500 4,500 8,750 8,750 8,750 26,250 10,000 14,000 10,000 34,000 174,375 251,250 SERIES OF 2015 BOND ISSUE/NOTE SERIES OF 2017 X X X X X X X X X X X X BOND ISSUE/NOTE SERIES OF 2016 BOND ISSUE/NOTE J. AMOUNT FINANCED FOR THIS PROJECT ONLY K. ORIGINAL ISSUE DISCOUNT/ PREMIUM FOR THIS PROJECT ONLY L. INTEREST EARNINGS FOR THIS PROJECT ONLY Q. TOTAL REVENUE SOURCES 83,109 BOND ISSUE/NOTE SERIES OF 2015 TOTAL PROJECT COSTS Revenue Sources 543,753 174,375 36,000,000 (F plus G-9 plus H-10) BOND ISSUE/NOTE SERIES OF 2016 600,000 BOND ISSUE/NOTE SERIES OF 2017 10,000,000 16,000,000 9,975,000 7,000 11,000 7,000 TOTAL 35,975,000 25,000 36,000,000 DETAILED COSTS D istrict/C T C : P rojectN am e: Montoursville Area High School P roject#: NEW EXISTING TOTAL 2,725,364 480,947 3,206,310 3. Plumbing 12,500 12,500 25,000 4. Electrical 180,000 20,000 200,000 9. Site Development Costs - Total 2,917,864 513,447 3,431,310 B. ARCHITECT'S FEE ON SITE DEVELOPMENT 175,072 30,807 205,879 A. Site Development Costs 1. General (include Rough Grading to Receive Building) 2. Heating and Ventilating EXISTING C. Asbestos Abatement 1. Asbestos Abatement 35,000 2. AHERA Clearance Air Monitoring 3. Asbestos Abatement - Total (D02, line A-5) D. EPA-CERTIFIED PROJECT DESIGNER'S FEE ON ASBESTOS 35,000 10,036 ABATEMENT (D02, LINE B-2) E. Roof Replacement / Repair 1. Roof Replacement Repair 50,000 2. Owner Controlled Insurance Program on Roof Replacement/Repair 3. Builder's Risk Insurance (if not included in primes) 4. Roof Replacement/Repair - Total F. ARCHITECT'S FEE ON ROOF REPLACEMENT/REPAIR 50,000 3,000 ACT 34 OF 1973: MAXIMUM BUILDING CONSTRUCTION COST FOR NEW BUILDING OR SUBSTANTIAL ADDITION ONLY D istrict/C T C : P rojectN am e: Montoursville P roject#: High School Act 34 applies only to costs for NEW CONSTRUCTION. The legal requirements do not address the costs for alterations to existing structures. For this reason, costs associated with the existing structure and other related costs should not be included in the following calculations. A. STRUCTURE COST, ARCHITECT'S FEE, MOVABLE FIXTURES AND EQUIPMENT (D02, line D-NEW) $ 27,206,945 $ 3,092,935 B. EXCLUDABLE COSTS FOR NEW CONSTRUCTION 1. Site Development Costs (D04, line A-7-NEW) $ 2,917,864 2. Architect's Fees on the above excludable costs 3. Vocational Projects Only - Movable Fixtures & Equipment (D02, line C-3-NEW) 4. Total Excludable Costs $ 175,072 $ (B-1 plus B-2 and B-3) C. ACT 34 MAXIMUM BUILDING CONSTRUCTION COST (A minus B-4) $ 24,114,009 $ 26,043,130 IF THE MAXIMUM BUILDING CONSTRUCTION COST BASED ON BIDS IS EQUAL TO OR GREATER THAN THE MAXIMUM BUILDING CONSTRUCTION COST BASED ON ESTIMATES PLUS EIGHT PERCENT (LINE D), A SECOND PUBLIC HEARING WILL BE REQUIRED BEFORE ENTERING INTO CONTRACTS AND STARTING CONSTRUCTION ON ANY PLANNED WORK. D. ACT 34 MAXIMUM BUILDING CONSTRUCTION COST TIMES 1.08 (C times 1.08) TABLE I Montoursville Area School District Comparison of Various Methods of Financing High School Costs General Obligation Local Authority SPSBA Costs of Construction: High School (1) 35,374,250 35,374,250 35,374,250 316,000 150,000 95,000 26,250 34,000 4,500 325,000 175,000 115,000 30,000 45,000 7,500 325,000 160,000 115,000 25,000 45,000 7,500 Total Requirements 36,000,000 36,071,750 36,051,750 Less: Interest Earned (3) 25,000 26,750 26,750 36,045,000 36,025,000 Financing Costs: (2) Bond Discount Legal Fees Bond Insurance Printing & Miscellaneous Rating & CUSIP Paying Agent Size of Bond Issues 35,975,000 Montoursville Area High School – Additions and Renovations ` Table IIA Average Annual Debt Service (1) $2,744,000 Net Debt Service After State Reimbursement (2) $2,493,500 Mills Required for Direct Debt 3.29 Mills 1.90Mills (3) Total Mills Required for Direct and Indirect Costs 3.2966Mills 1.9066Mills (3) TABLE IIB Montoursville Area School District Wraparound Debt Structure Act 34 Hearing: Millage Requirement Study - Series of 2015 - $10,000,000, Series of 2016 - $16,000,000, Series of 2017 - $9,975,000 Option 1 Wrap: $35,975,000 (0.20 Additional Mills, Use of Surplus, 6 Year Millage Phase-In) 16-Dec-14 Fiscal Year Ending June 30 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 TOTAL Total Net Outstanding D/S (1) Series 2015 $10,000,000 Bond Issue Net D/S (2) Series 2016 $16,000,000 Bond Issue Net D/S (3) Series 2017 $9,975,000 Bond Issue Net D/S (4) 2,013,256 2,012,458 2,012,021 2,014,078 2,015,255 2,016,099 2,014,713 2,014,346 1,622,544 0 0 0 0 0 0 0 0 0 0 0 0 0 0 410,397 378,828 378,828 378,828 378,828 378,828 378,828 378,828 998,828 999,980 999,628 997,782 999,458 999,431 997,567 998,877 998,262 1,000,743 996,148 999,628 1,000,896 0 286,334 687,201 687,201 687,201 687,201 687,201 687,201 687,201 1,647,201 1,648,217 1,646,601 1,652,358 1,650,110 1,649,953 1,651,465 1,649,435 1,648,995 1,644,951 1,652,342 1,645,382 1,644,732 0 0 165,096 506,231 509,911 508,071 505,863 508,241 899,953 944,349 940,201 944,315 936,683 937,680 936,939 939,399 939,721 942,901 943,801 942,432 943,815 392,663 0 0 17,734,770 0 0 16,049,419 0 0 26,528,475 0 0 15,288,261 Less: Interest Earnings/ SD Reserves (5) 20,419 312,008 412,832 175,321 920,578 Total Net Debt Value of 1 Mill (6) Mills Total Available Mills New Mills from Prior Required Debt Total Mills in Place Dollars Appropriated Budget Surplus (Deficit) 2,013,256 2,688,770 2,931,138 3,173,506 3,415,874 3,590,199 3,586,605 3,588,616 3,588,526 3,590,377 3,588,398 3,590,544 3,586,823 3,587,248 3,586,322 3,588,430 3,588,032 3,590,157 3,589,495 3,590,922 3,588,825 3,038,291 757,400 757,400 757,400 757,400 757,400 757,400 757,400 757,400 757,400 757,400 757,400 757,400 757,400 757,400 757,400 757,400 757,400 757,400 757,400 757,400 757,400 757,400 2.66 3.55 3.87 4.19 4.51 4.74 4.74 4.74 4.74 4.74 4.74 4.74 4.74 4.74 4.74 4.74 4.74 4.74 4.74 4.74 4.74 4.01 0.360 0.340 0.320 0.320 0.320 0.240 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 2.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.21 3.55 3.87 4.19 4.51 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 2,431,254 2,688,770 2,931,138 3,173,506 3,415,874 3,597,650 3,597,650 3,597,650 3,597,650 3,597,650 3,597,650 3,597,650 3,597,650 3,597,650 3,597,650 3,597,650 3,597,650 3,597,650 3,597,650 3,597,650 3,597,650 3,597,650 417,998 0 0 0 0 7,452 11,046 9,035 9,125 7,273 9,253 7,107 10,828 10,402 11,329 9,221 9,619 7,494 8,156 6,729 8,825 559,360 0 0 74,680,347 757,400 757,400 0.00 0.00 0.000 0.000 1.900 0.00 0.00 4.75 4.75 3,597,650 3,597,650 3,597,650 3,597,650 Bond Debt Service Montoursville Area School District Proposed GO Bonds, Series of 2015 ($10MM Wrap) Dated Date 5/1/2015 Delivery Date 5/1/2015 rincipal Coupon Interest 220,983.00 189,414.00 189,414.00 189,414.00 189,414.00 189,414.00 189,414.00 189,414.00 189,414.00 189,414.00 189,414.00 189,414.00 Debt Service 220,983.00 189,414.00 189,414.00 189,414.00 189,414.00 189,414.00 189,414.00 189,414.00 189,414.00 189,414.00 189,414.00 189,414.00 Period Ending 12/1/2015 6/1/2016 12/1/2016 6/1/2017 12/1/2017 6/1/2018 12/1/2018 6/1/2019 12/1/2019 6/1/2020 12/1/2020 6/1/2021 12/1/2021 6/1/2022 12/1/2022 6/1/2023 12/1/2023 6/1/2024 12/1/2024 6/1/2025 12/1/2025 6/1/2026 12/1/2026 6/1/2027 12/1/2027 6/1/2028 12/1/2028 6/1/2029 12/1/2029 6/1/2030 12/1/2030 6/1/2031 12/1/2031 6/1/2032 12/1/2032 6/1/2033 12/1/2033 6/1/2034 12/1/2034 6/1/2035 12/1/2035 6/1/2036 Principal Coupon Annual Debt Service 620,000 3.040% 410,397.00 640,000 3.180% 660,000 3.310% 680,000 3.430% 705,000 3.550% 730,000 3.680% 378,828.00 755,000 3.800% 785,000 3.900% 378,828.00 815,000 3.990% 850,000 4.070% 378,828.00 880,000 4.150% 920,000 4.210% 960,000 378,828.00 4.260% 378,828.00 10,000,000 Interest Debt Service Annual Debt Service 220,983.00 220,983.00 189,414.00 189,414.00 410,397.00 189,414.00 189,414.00 189,414.00 189,414.00 378,828.00 189,414.00 189,414.00 189,414.00 189,414.00 378,828.00 189,414.00 189,414.00 189,414.00 189,414.00 378,828.00 189,414.00 189,414.00 189,414.00 189,414.00 378,828.00 189,414.00 189,414.00 189,414.00 189,414.00 378,828.00 189,414.00 189,414.00 189,414.00 189,414.00 378,828.00 189,414.00 189,414.00 189,414.00 189,414.00 378,828.00 189,414.00 189,414.00 189,414.00 809,414.00 998,828.00 179,990.00 179,990.00 179,990.00 819,990.00 999,980.00 169,814.00 169,814.00 169,814.00 829,814.00 999,628.00 158,891.00 158,891.00 158,891.00 838,891.00 997,782.00 147,229.00 147,229.00 147,229.00 852,229.00 999,458.00 134,715.25 134,715.25 134,715.25 864,715.25 999,430.50 121,283.25 121,283.25 121,283.25 876,283.25 997,566.50 106,938.25 106,938.25 106,938.25 891,938.25 998,876.50 91,630.75 91,630.75 91,630.75 906,630.75 998,261.50 75,371.50 75,371.50 75,371.50 925,371.50 1,000,743.00 58,074.00 58,074.00 58,074.00 938,074.00 996,148.00 39,814.00 39,814.00 39,814.00 959,814.00 999,628.00 20,448.00 20,448.00 20,448.00 980,448.00 1,000,896.00 6,049,419.00 16,049,419.00 16,049,419.00 Bond Debt Service Montoursville Area School District Proposed GO Bonds, Series of 2016 ($16MM Wrap) Dated Date 1/1/2016 Delivery Date 1/1/2016 Principal Coupon Interest 286,333.54 343,600.25 343,600.25 343,600.25 343,600.25 343,600.25 343,600.25 343,600.25 343,600.25 343,600.25 343,600.25 Debt Service 286,333.54 343,600.25 343,600.25 343,600.25 343,600.25 343,600.25 343,600.25 343,600.25 343,600.25 343,600.25 343,600.25 Period Ending 6/1/2016 12/1/2016 6/1/2017 12/1/2017 6/1/2018 12/1/2018 6/1/2019 12/1/2019 6/1/2020 12/1/2020 6/1/2021 12/1/2021 6/1/2022 12/1/2022 6/1/2023 12/1/2023 6/1/2024 12/1/2024 6/1/2025 12/1/2025 6/1/2026 12/1/2026 6/1/2027 12/1/2027 6/1/2028 12/1/2028 6/1/2029 12/1/2029 6/1/2030 12/1/2030 6/1/2031 12/1/2031 6/1/2032 12/1/2032 6/1/2033 12/1/2033 6/1/2034 12/1/2034 6/1/2035 12/1/2035 6/1/2036 Principal Coupon Annual Debt 3.540% 960,000 Service 995,000 3.680% 286,333.54 1,030,000 3.810% 1,075,000 3.930% 687,200.50 1,115,000 4.050% 1,160,000 4.180% 687,200.50 1,210,000 4.300% 1,260,000 4.400% 687,200.50 1,315,000 4.490% 1,370,000 4.570% 1,440,000 4.650% 687,200.50 1,500,000 4.710% 1,570,000 4.760% 687,200.50 16,000,000 Interest 286,333.54 343,600.25 343,600.25 343,600.25 343,600.25 343,600.25 343,600.25 343,600.25 343,600.25 343,600.25 343,600.25 343,600.25 343,600.25 343,600.25 343,600.25 343,600.25 343,600.25 326,608.25 326,608.25 308,300.25 308,300.25 288,678.75 288,678.75 267,555.00 267,555.00 244,976.25 244,976.25 220,732.25 220,732.25 194,717.25 194,717.25 166,997.25 166,997.25 137,475.50 137,475.50 106,171.00 106,171.00 72,691.00 72,691.00 37,366.00 37,366.00 10,528,475.04 Annual Debt Service 286,333.54 286,333.54 343,600.25 343,600.25 687,200.50 343,600.25 343,600.25 687,200.50 343,600.25 343,600.25 687,200.50 343,600.25 343,600.25 687,200.50 343,600.25 343,600.25 687,200.50 343,600.25 343,600.25 687,200.50 343,600.25 343,600.25 687,200.50 343,600.25 1,303,600.25 1,647,200.50 326,608.25 1,321,608.25 1,648,216.50 308,300.25 1,338,300.25 1,646,600.50 288,678.75 1,363,678.75 1,652,357.50 267,555.00 1,382,555.00 1,650,110.00 244,976.25 1,404,976.25 1,649,952.50 220,732.25 1,430,732.25 1,651,464.50 194,717.25 1,454,717.25 1,649,434.50 166,997.25 1,481,997.25 1,648,994.50 137,475.50 1,507,475.50 1,644,951.00 106,171.00 1,546,171.00 1,652,342.00 72,691.00 1,572,691.00 1,645,382.00 37,366.00 1,607,366.00 1,644,732.00 26,528,475.04 26,528,475.04 Debt Service Bond Debt Service Montoursville Area School District Proposed GO Bonds, Series of 2017 ($9.975MM Wrap) Dated Date 1/1/2017 Delivery Date 1/1/2017 Principal 110,000 Coupon 1.200% 115,000 1.600% 115,000 1.920% 115,000 120,000 2.280% 2.740% Interest 165,096.25 198,115.50 198,115.50 197,455.50 197,455.50 196,535.50 196,535.50 195,431.50 195,431.50 194,120.50 194,120.50 192,476.50 Period Ending 6/1/2017 12/1/2017 6/1/2018 12/1/2018 6/1/2019 12/1/2019 6/1/2020 12/1/2020 6/1/2021 12/1/2021 6/1/2022 12/1/2022 6/1/2023 12/1/2023 6/1/2024 12/1/2024 6/1/2025 12/1/2025 6/1/2026 12/1/2026 6/1/2027 12/1/2027 6/1/2028 12/1/2028 6/1/2029 12/1/2029 6/1/2030 12/1/2030 6/1/2031 12/1/2031 6/1/2032 12/1/2032 6/1/2033 12/1/2033 6/1/2034 12/1/2034 6/1/2035 12/1/2035 6/1/2036 Principal 110,000 1.200% 115,000 1.600% 115,000 1.920% 115,000 2.280% 120,000 2.740% 515,000 3.030% 575,000 Annual Debt Service590,000 165,096.25 165,096.25 615,000 198,115.50 630,000 308,115.50 506,231.00 655,000 197,455.50 680,000 312,455.50 509,911.00 710,000 196,535.50 740,000 311,535.50 508,071.00 775,000 195,431.50 810,000 310,431.50 505,863.00 845,000 194,120.50 885,000 314,120.50 508,241.00 375,000 192,476.50 9,975,000 Debt Service Coupon 3.330% 3.540% 3.680% 3.810% 3.930% 4.050% 4.180% 4.300% 4.400% 4.490% 4.570% 4.650% 4.710% Interest 165,096.25 198,115.50 198,115.50 197,455.50 197,455.50 196,535.50 196,535.50 195,431.50 195,431.50 194,120.50 194,120.50 192,476.50 192,476.50 184,674.25 184,674.25 175,100.50 175,100.50 164,657.50 164,657.50 153,341.50 153,341.50 141,340.00 141,340.00 128,469.25 128,469.25 114,699.25 114,699.25 99,860.25 99,860.25 83,950.25 83,950.25 66,900.25 66,900.25 48,715.75 48,715.75 29,407.50 29,407.50 8,831.25 8,831.25 5,313,261.25 Annual Debt Service 165,096.25 165,096.25 198,115.50 308,115.50 506,231.00 197,455.50 312,455.50 509,911.00 196,535.50 311,535.50 508,071.00 195,431.50 310,431.50 505,863.00 194,120.50 314,120.50 508,241.00 192,476.50 707,476.50 899,953.00 184,674.25 759,674.25 944,348.50 175,100.50 765,100.50 940,201.00 164,657.50 779,657.50 944,315.00 153,341.50 783,341.50 936,683.00 141,340.00 796,340.00 937,680.00 128,469.25 808,469.25 936,938.50 114,699.25 824,699.25 939,398.50 99,860.25 839,860.25 939,720.50 83,950.25 858,950.25 942,900.50 66,900.25 876,900.25 943,800.50 48,715.75 893,715.75 942,431.50 29,407.50 914,407.50 943,815.00 8,831.25 383,831.25 392,662.50 15,288,261.25 15,288,261.25 Debt Service INDIRECT COSTS FOR RENOVATIONS/ADDITIONS TO HIGH SCHOOL The following figures reflect anticipated changes in indirect costs for the proposed High School Project. Since the High School will remain at the existing site with renovations and additions, the Indirect Costs associated with the Project are minimal. In assessing potential increases in related costs, the following categories were studied. PERSONNEL: Current teaching staff, instructional assistants, and office staff will be sufficient to meet anticipated needs unless any program changes are made and/or if significant growth in student enrollment occurs. MATERIALS & SUPPLIES: No additional costs are anticipated unless program changes are made and/or if significant growth in student enrollment occurs. COST OF FUEL & UTILITIES: there could be energy savings. No additional costs are anticipated and with updated systems BUILDING OPERATION & MAINTENANCE: Increased costs for maintenance supplies for the building will be approximately the same as current budget. PUPIL TRANSPORTATION: No changes in pupil transportation costs are anticipated as a result of the Project. INSURANCE PREMIUM: The increase in insurance premium to cover the Project is estimated to be $5,000 per year. TOTAL ANNUAL INDIRECT COSTS: VALUE OF ONE MILL MILLAGE IMPACT INDIRECT COSTS: $ 5,000 $ 757,400 0 .0066 Mills Montoursville Area High School – Additions and Renovations Act 34 Maximum Building Construction Cost ` Maximum Total Project Cost Be it resolved that the Board of School Directors of MONTOURSVILLE AREA SCHOOL DISTRICT approves the maximum building cost and maximum project cost listed below. Be it further resolved that the following costs have been estimated: Act 34 Maximum Building Construction Cost (new areas of building only) (Includes: Structure Cost, Architect’s Fee, Moveable Furniture & Equipment less Site Development Costs and Architect’s Site Design Fee.) $ 24,114,009 Other Project Costs (renovation costs, site costs, and soft costs) $ 11,885,991 Maximum Project Cost $ 36,000,000 Project Credits State Reimbursement Estimate $ (3,300,000) Montoursville Area High School – Additions and Renovations PUBLIC HEARING NOTICE ` Please take notice that a public hearing will be held at the Montoursville Area High School Auditorium, 100 N. Arch Street, Montoursville, PA 17754 on Tuesday February 24, 2015 at 7:30 p.m. for the purpose of reviewing relevant matters relating to the additions to and renovations of the Montoursville Area High School (the "Project"). A description of the Project, including facts relative to educational, physical, administrative, budgetary and fiscal matters of the project, will be presented and will be available for consideration at this public hearing. Beginning Tuesday, February 3, 2015 a project description booklet will be available for review during business hours (8:00 am to 4:00 pm) at the Montoursville Area School District Offices at 100 N. Arch Street, Montoursville, PA. The Board of School Directors of the Montoursville Area School District has adopted, by resolution, the following costs in connection with this project: Act 34 Maximum Building Construction Cost (new areas of Building only) (Includes: Structure Cost, Architect’s Fee, Moveable Furniture & Equipment less Site Development Costs and Architect’s Site Design Fee.) $ 24,114,009 Other Project Costs (renovation costs, site costs, and soft costs) $ 11,885,991 Maximum Project Cost $ 36,000,000 Project Credits State Reimbursement Estimate $ (3,300,000) This public hearing is being held pursuant to the requirements of PA Public School Code of 1949, approved March 10, 1949, as amended and supplemented, including amendments made pursuant to Act 34 of the session of 1973 of the General Assembly. Interested parties that want to be placed on the public hearing agenda may submit their names to the District Office (address listed above) until 12:00 noon on Tuesday February 24, 2015. Additional testimony will be received from the floor at the hearing. Any and all interested parties may appear at and attend the public hearing and may be heard at such public hearing, (one person, one comment at a time, five minute limitation per individual), and/or may submit written testimony to the Secretary of the School Board of Directors at the District Office (address listed above) until 12:00 noon, 30 days after hearing, on Thursday, March 26, 2015. Existing Conditions Montoursville Area High School - Deficiencies Significant deficiencies identified at the Montoursville Area High School include the following: Some Educational Spaces are too small Classrooms Science labs Band and Choral rooms Auditorium/Stage Family and Consumer Science Fitness Center Guidance facilities Inadequate quantity of Educational Spaces Science labs Some spaces don't exist No central gathering/reception space for large groups ( lobby, commons, etc.) Community spaces Specialized art facilities Black Box Theater No central gathering/reception space for large groups ( lobby, commons, etc.) Community spaces Specialized art facilities Black Box Theater Existing Conditions Building Organization Major public spaces are not controlled from one area (gym, auditorium, cafeteria ) Location of classrooms makes department organization difficult Safety and Security compromises Numerous entrances Internal high school office minimizes view to exterior Corridors Spaces utilitarian and lack legibility Too narrow in some areas Intersections are too small and interfere with efficiency No daylight in most areas Building Infrastructure Doors difficult to maintain due to wood framing seasonal movement Wood framing renovations possible but expensive HVAC system replacement recommended Plumbing system replacement recommended Replace portions of electrical system