Transcript CI CHARTS
Kaizen SMED Forms FORMS WASTE ANALYSIS WASTE OVERPRODUCTION WAITING TRANSPORT INEFFICENT PROCESS INVENTORY UNNECESSARY MOVEMENTS DEFECTS Event: Team: Location: Date: OBSERVED CAUSE IMPLEMENTATION REF OPPORTUNITY SELECTOR No Opportunity Event: Team: Location: Date: Ref No Opportunity EASY HIGH A LOW B HARD C D Ref ACTION CHART Event: Page Location: N o. Conce rn Team: D a te Counte rme a sure R a ise d of Date: R e sp. T a rge t D a te % Comple te 25% 50% 75% Comple te Confirm OK 100% D a te D a te ACTION CHART Event: Page Location: No. Comment Team: Measure of Date: Who When Prog. SPAGHETTI DIAGRAM Process: Team: Location: Date: OPERATIONAL SEQUENCE CHART Operation: Process: Team: Location: Date: SMED SET-UP TIMES Part: Team: M/C: Date: CURRENT TIME No Task/Operation Internal External IMPROVEMENT OPERATION CURRENT TOTAL Tool: PROPOSED TIME Internal IMPROVED TOTAL Internal: Operations that necessitate the stopping of the machine External: Operations not requiring the stopping of the machine. Key Terms: ASSEMBLE, DISMANTLE, USE, TRANSPORT (EMPTY), TAKE, TRANSPORT (FULL), PUT DOWN, FIND, CHOOSE, INSPECT, DEPLACE (REPOSITION), HOLD, WAIT, LOOK FOR. External TOTAL PRODUCTIVE EFFECTIVENESS Process: Team: Location: Date: Availability Rate: (Equipment failure, Set-up & adjustment, Tool change, Start-up) Available Time - Down Time = Availability Rate % = Available M/C Time Performance Rate: Standard Time X (Minor stops & idling, Speed loss) x Units made = Performance Rate % = Operating Time Quality Rate: X (Scrap & rework) Parts Count - Defects = Quality Rate % = Parts Count Alternatives: Performance Rate = (Op Time - Perf. loss)/OpT Quality Rate = (Productive time - Defect time)/Prod Time = TPE % = Quality Loss Scrap/Rework Perform. Loss Speed loss Stops/Idling Avail. Loss Start-up loss Tool Change Set-up/adjust Equip Failure Run Time End Start TPE OBSERVATION Equip.: Name: Part: Date: Remarks Department: Machine: Time After Time Before Job begins on the Job ends on the Time After Time Before Job begins on the Job ends on the Time After Time Before Job begins on the Job ends on the Time After Time Before Job begins on the Job ends on the Time After Time Before Job begins on the Job ends on the Improvement Measurement Improvement Dates Responsible for follow-up Problem Description and suggested improvement Process owner Scrap & Rework Idling, minor stoppages and speed loss Set-up & Adjustment Tool Change Breakdowns, Start-up Eater Date: Effectiveness Improvement Sheet