Transcript Document
MODUL 3 Sentral SPC Digital 1 TUJUAN Memahami arsitektur sentral SPC digital, bagian-bagian/komponen dan fungsi masingkomponen Memahami prinsip kerja sentral SPC digital dalam proses panggilan (call processing) 2 1. Arsitektur Dasar Sentral Digital 1 4 7 * 2 5 8 0 3 6 9 # Subscribers 1 4 7 * 2 5 8 0 EXCHANGE Subscriber lines (access network) Subscriber Line Circuit 3 6 9 # Switching Unit Trunk Circuit Trunk Lines (E1/T1) To/from other Exchange Signaling Unit Control Unit 3 2. Unit-unit fungsional sentral dig GROUP SWITCH UNIT TRUNK DLTU digital DLTU M D F Sub Line Term Unit M U X Sub Concen Switch Block CAS MF Sig Swblk Control SUBSCRIBER CONCENTRATOR UNIT Group Switch Block Analogue Trunk Term Unit CCS Tones MF Sig DLTU D D F analogue Tones & ann Swblk Control Exchange-control system 4 3. Sentral Telepon Digital EWSD Hardware Structure Access Switching LTG GP Divided into 4 functions : – Access unit (Access Unit) – Switching Unit (SN=Switching Network) – Common Channel signalling Network Control – Control Unit (CP = Coordination Processor) DLU DLUC LTG GP Common Channel Signalling CCNC CCNP SN Coordination Processor SYP SYPD SSP MB MBC CCG SGC 5 A. Access Unit • • As an interface between subscriber line or trunk with central (Exchange) Consists of : – Digital Line Unit (DLU) – Line Trunk Group (LTG) LTG A Analog Subscriber Line GP SLMA DLU LTG B SLM ISDN Subscriber Line GP LTG C Trunk Digital SN GP CCNC CCNP CP O/M SGC 6 1) • • • LTG (Line Trunk Group) As connector between analog or digital device(antara perangkat analog atau digital yang berada di luar sentral EWSD dengan Switching Network. Pada LTG dapat terpasang saluran pelanggan, Trunk dan Digital Switch Board (DSB) Sentral EWSD mempunyai 4 macam (tipe) LTG – LTGA • Digunakan untuk saluran pelanggan analog • Tiap unit LTGA mempunyai 8 buah LTU (Line Trunk Unit) • Kapasitas tiap unit LTGA : 256 port pelanggan – LTG B • Merupakan terminasi ke : – DLU (Digital Line Unit) untuk mencatu pelanggan (analog/digital). – DSB (Digital Switch Board) untuk layanan khusus (special service) melalui operator seperti layanan informasi nomor telepon/billing, sambungan interlokal/internasional, pengaduan gangguan dll. • Kapasitas tiap unit LTGB = 4 sistem PCM-30 (= 4x30 kanal voice) – Untuk aplikasi DLU : maksimal dapat melayani hingga 952 pelanggan analog – Untuk aplikasi DSB : dapat dipasang 30 terminal/meja operator (switchboard) – LTG C • Merupakan saluran sirkit trunk digital 4 DIU (Digital Interface Unit) • Dapat dihubungkan dengan 120 trunk digital – LTG D • Digunakan untuk trunk digital internasional menggunakan transmisi sateli, dilengkapi echo canceller 7 a) The Parts of the LTG (Line Trunk Group) Consists of : • Group Prosesor (GP) – – – – – • LTU n GS atau SPMX 8 Mbit LIU Connector for Functional units in LTG subscriber Connector for Functional units in LTG Trunk connector SU Signalling Unit (SU) – • Connector EWSD with PCM transmission System Speech Multiplexer (SPMX) – • Costumize subscriber line/trunk with LTG Group Switch (GS) – • LTU 1 Digital Interface Unit (DIU) – • 2 Mbit Line Trunk Unit (LTU) – • Set the signalling Procedures Set the SLC and LTG Supervision, Metering for call processing Organize and process data exchange with CP Scanning LTG ports For Signalling process trunk and Subscriber Link Interface Unit (LIU) – – – GP Mengadakan cross office check Syncronization bits received SN Adjusting (menyesuaikan) clock with CCG 8 2) DLU (Digital Line Unit) Digital Line Unit Analog Subscriber • As a analog, digital, and PABX termination subscriber line. • Maximum capacity 952 subscribers Digital linked to EWSD central office via 4 x Subscriber PCM highway (120 Channels) 2 LTG for increased availability • Can be placed one location with a main or as a remote central • DLU Units : – – – – – – – – Subscriber Line Module Analog (SLMA) Subscriber Line Modul Digital (SLMD) Ring Generator dan Metering Generator (RGMG) Digital Interface Unit for DLU (DIUD) Digital Line Unit Control (DLUC) Test Unit (TU) Emergency Module for Pushbutton Subscriber (EMSP) External Alarm Set (ALEX) SLMA RGMG SLMD EMSP TU DIUD LTGB ALEX DLUC 9 B. SN (Switching Network) • SN merupakan bagian yang bertugas melaksanakan proses penyambungan saluran-saluran yang terhubung padanya • Ada 2 prinsip penyambungan yang digunakan : time switching dan space switching • SN terdiri dari 3 modul switching : – – – – Time Stage Module (TSM), parameter 4/4 input,4/4 output Space Stage Module (SSM), parameter 16/16 Space Stage Module (SSM),parameter 8/15 input, 15/8 output SN DE3 : 4 TSM dan 1 SSM didupliksdi SN0 dan SN1, kapasitas pelanggan : 3000 pelanggan dan 1500 trunk – SN DE4 :16 TSM dan 4 SSM, kapasitas pelanggan : 12000 pelanggan dan 7500 trunk – SN DE5 : 16 TSM yang tergabung dalam satu Time Stage, kapasitas pelanggan : 100.000 pelanggan dan 60.00 trunk – Time Stage Group (TSG) dan satu Space Stage Group (SSG) yang merupakan gabungan dari 16 SSM 8/15 dan 15 SSM 16/16, TSG di duplikasi dan mempunyai satu SGC Catatan : DE = Digital Exchange 10 a) Tipe-tipe SN i. SN DE3 • Untuk sentral kapasitas kecil (max 5000 sst) • Biasanya berupa/tipe container (box) 11 ii. SN DE4 • Untuk sentral dengan kapasitas sedang (max 15.000 sst) • Tipe instalasi dalam gedung (building) 12 iii. SN DE4 • Exchange with high capacity (until 150.000 sst) • Type : Building 13 C. CP (Coordination Processor) Fungsi CP : – – – – – – – – Analizing number ruting and zoning Operation and maintenance Exchange Routing for call processing Giving alternatif route Analizing and send message for line/trunk Trafik measurement Data Billing Menyekat peralatan yang rusak MB CCG IOP Functional Units – Siemen Switching Processor (SSP): • • • – PU MU BA Sebagai interface peripheral processor (GP, DLUC, SGC) dengan PU Central Clock Generator (CCG) • – Processing Unit (PU) Memory Unit (MU) Input/Output Processor (IOP) Message Buffer (MB) • – BEU Pengmbangkit clock sentral Input/Output Device • • • SYPC (System Panel Control) Terminal Input/output : PT 88, PT 80 dan VDU (Video Display Unit) External Memory : MDD (Magnetic Disk Device) atau MTD (Magnetic Tape Device) 14 D. CCNC (Common Channel signaling Network Control) Secondary Digital Carrier( SDC) 8 Mbps – Bagian yang berfungsi meproses pensinyalan CCS No. 7. – CCNC dihubungkan langsung dengan CP. – Sinyal yang datang dari sentral lawan setelah diolah CCNP (CCNC Processor) dapat ditransfer langsung ke GP atau diserahke CP LTG Common Signaling Channel ( CSC) SN GP LTG GP LTG GP CCNC CP IOP MB MB Signalling Transfer Part (STP) Signalling End Point (SEP) 15 E. Konfigurasi lengkap sentral EWSD Switching Local Application DLU SN 1 SN 0 LTGB DLUC GP LTGC Remote Application DLU GP LTGB DLUC GP Dari/ke sentral lain LTGC DLU LTGB DLUC GP GP LTGB DLU GP DLUC LTGC GP Common Channel Signaling CCNC SGC CCNP MB EM SYP MBC SYPC speech path CP control path OMT CCG 16 4. Pembangunan hubungan (1) 1 4 7 * 2 5 8 0 LTG DLU 3 6 9 # SLM SLCA GS DIUD SN LIU DIU COC A-Subscriber SU SLMP DLUC TOG CR GP DLU 1 2 3 4 5 6 7 8 9 * 0 # Ringing current LTG SLM SLCA GS DIUD LIU DIU B-Subscriber SU TOG SLMP DLUC CR Ringing tone GP Control signals Checks Dial tone & dialled information Ringing current & ringing tone Voice connection CP SGC 17 4. Pembangunan hubungan (2) DLU 1 4 7 * 2 5 8 0 LTG SN SLMA 3 6 9 # GS 10a A-Subscriber 9 SLCA DIUD LIU DIU COC 15b 6b 1 3 SU 2 SLMCP TOG 7d CR DLUC 8c 5 10b 7a 7b 10c 8d 8b 8a 4 6a 11 16 15a 12 GP 22 LTG DLU 1 2 3 4 5 6 7 8 9 * 0 # SLMA Ringing current GS 26 SLCA DIUD Ringing current B-Subscriber 22a 21b 18 21a RGE SLMCP 22b LIU DIU 23b SU TOG 23a DLUC 20 Ringing tone CR 24b 17b 21 17a 25a 19 24a 27 GP Control signals Checks Dial tone & dialled information Ringing current & ringing tone Voice connection 13 CP 14 SGC 18 4. Pembangunan hubungan (3) CALL PROCESSING (DALAM SENTRAL) 1. A mengangkat hs SLMCP mendeteksi (berdasarkan hasil scanning pada SLCA) 2. SLMCP meneruskan pesan tsb ke DLUC 3. DLUC meneruskan ke GP (melalui DIU) 4. GP memeriksa data A (EQN, COS/restriction) dan memilih kanal (ts) untuk hubungan 5. GP memberitahu ts ke SLMCP 6a.GP mengaktifkan ts pd GS dan melakukan tes koneksi antara LTG – pel A dg mngirim test tone (6b) dari TOG ke GS-DIU-DIUD-SLCA 7. Hasil test diterima CR, diterjemahkannya dan diteruskan ke GP Jika hasil tes ok, maka GP : 8a. Memerintahkan SLMCP utk mengaktifkan ts dan menghubungkannya ke A 8b. Mengaktifkan sumber nada pilih (pd TOG) dan mengirimkannnya ke A (8c) 8d. Mempersiapkan CR utk menerima sinyal digit (no tlp B) dari A 9. SLCA meneruskan nada pilih ke A dalam format analog 10a. Pelanggan A mendial digit B 10b. Sinyal digit diterima CR, diterjemahkannya dan diteruskan ke GP (10c). 11.Saat digit prtama diterima, GP memerintahkan utk menonaktifkan ts utk jalur nada pilih (mnghentikan nada pilih) 12.Jika semua digit tlh diterima GP, maka GP meneruskannya ke CP disertai data lainnya ttg A yg diperlukan CP 13.Memeriksa data base B tentang : - COS & SCOS pelanggan B. - Lokasi hardware B (identitas LTG-B, DLU-B, SLMA-B dan port B pd SLMA) - Status (bebas/sibuk) Jika B bebas, maka : 19 4. Pembangunan hubungan (4) 14. CP memilih jalur (ts SN) utk menghub LTG-A & LTG-B serta mengirimkannya ke SGC dan juga memerintahkan GP untuk melakukan COC 15a. GP memerintahkan LIU utk melakukan COC (15b). Jika COC ok, maka : 16. GP-A menset ts pada GS utk speech path A-B dan memberitahu GP LTG-B ttg hub yang terbentuk 17a. GP-B menandai ts utk speech path tsb di sisi B dan 17b. Memberitahu SLMCP-B ttg ts tsb dan 18. SLMCP-B mengaktifkan ts tsb pd SLCA-B 19. GP-B mengaktifkan ts (pd GS) utk hub tsb. 20. GP-B memerintahkan cek jalur (test tone dari TOG-DIU-DIUD-SLCA-B) Jika hasil cek ok, maka : 21. GP-B memerintahkan : - DLUC utk kirim ringing current (ke B) - TOG utk kirim ringing tone (ke A) 22. Jika B menjawab (hasil scanning SLMCP-B (22a)), maka 22b. SLMCP-B melaporkannya ke DLUC-B 23. DLUC-B menghentikan ringing current dan juga melaporkan bhw Btlh mnjawab ke GP-B. 24a. GP-B menghentikan ringing tone (dg menonaktifkan ts pd GS) dan 24b Mengaktifkan ts untukjalur bicara 25a. GP-B mengirim message “answer signal” ke GP-A untuk keperluan charging (metering) 26. Selama proses pembicaraan, kedua GP memonitor kedua pelanggan (melalui SLMCP dan DLUC) 27. Saat akhir pembubaran data charging/meter ditransfer dari GP-A ke CP 20 5. Sentral STDI-K SPCH 0 SPCH 1 SLMA SLMA CB 0 DLUC-R0 Terminal PCDL M PC CB 1 DLUC-R0 Floppy disk TU Hard disk SUR PCM links to distant exchange DIUD-R0 DIUD-R1 PCM links to distant exchange 21